Building Construction The triangular portion between any two adjacent arches and the tangent to their crowns, is Rise Spandril Soffit Haunch Rise Spandril Soffit Haunch ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.5 du 1.25 du 1.75 du 1.35 du 1.5 du 1.25 du 1.75 du 1.35 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of Raymond pile Diameter of top of piles varies from 40 cm to 60 cm Lengths vary from 6 m to 12 m Diameter of pile at bottom varies from 20 cm to 28 cm All listed here Diameter of top of piles varies from 40 cm to 60 cm Lengths vary from 6 m to 12 m Diameter of pile at bottom varies from 20 cm to 28 cm All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil, may be improved by Chemical action Drainage Grouting Compaction Chemical action Drainage Grouting Compaction ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 4 days 14 days 7 days 1 day 4 days 14 days 7 days 1 day ANSWER DOWNLOAD EXAMIANS APP