Building Construction In case of Raymond pile Lengths vary from 6 m to 12 m All listed here Diameter of top of piles varies from 40 cm to 60 cm Diameter of pile at bottom varies from 20 cm to 28 cm Lengths vary from 6 m to 12 m All listed here Diameter of top of piles varies from 40 cm to 60 cm Diameter of pile at bottom varies from 20 cm to 28 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The thickness of a reinforced brick partition wall, is generally kept 20 cm 10 cm 15 cm 5 cm 20 cm 10 cm 15 cm 5 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of bond in which every course contains both headers and stretchers, is called Flemish bond Mixed bond English bond Russian bond Flemish bond Mixed bond English bond Russian bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: Igneous rock None of these Sedimentary rock Metamorphic rock Igneous rock None of these Sedimentary rock Metamorphic rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Levelling staff Boning rod Ranging rod Steel tape Levelling staff Boning rod Ranging rod Steel tape ANSWER DOWNLOAD EXAMIANS APP
Building Construction Bearing capacity of soils cannot be improved by Watering surface of soil Ramming crushed stone in soil Draining sub-soil water Driving sand piles Watering surface of soil Ramming crushed stone in soil Draining sub-soil water Driving sand piles ANSWER DOWNLOAD EXAMIANS APP