Building Construction Which one of the following activities is not correct as applicable to brick corbels Stretcher bond is generally used for the construction of brick corbel The maximum projection of each corbel course should be limited to a quarter brick at a time The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The maximum projection of each corbel course should be limited to a quarter brick at a time The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as Half king closer King closer Queen closer Bevelled closer Half king closer King closer Queen closer Bevelled closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The function of cleats in a roof truss is All of these To support purlins To prevent the purlins from tilting To support the common rafter All of these To support purlins To prevent the purlins from tilting To support the common rafter ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of an arch is the distance between Crown and ground level Intrados and extrados Ground level and springing line Crown and springing line Crown and ground level Intrados and extrados Ground level and springing line Crown and springing line ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 14 days 4 days 7 days 1 day 14 days 4 days 7 days 1 day ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical member running through middle of a shutter frame, is Mullion Reveal Post Style Mullion Reveal Post Style ANSWER DOWNLOAD EXAMIANS APP