Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of each corbel course should be limited to a quarter brick at a time The discontinuous corbels are used to carry heavy concentrated loads Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time The discontinuous corbels are used to carry heavy concentrated loads Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 to 40 mm 65 to 100 mm 25 mm 40 to 65 mm 25 to 40 mm 65 to 100 mm 25 mm 40 to 65 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as Closer Stretcher Bat Header Closer Stretcher Bat Header ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum number of steps in a flight should generally be restricted to 12 15 10 No limit 12 15 10 No limit ANSWER DOWNLOAD EXAMIANS APP
Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Ground level Plinth level Water table level Midway ground level and water-table level Ground level Plinth level Water table level Midway ground level and water-table level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for beams and slabs; is 50 to 100 mm 30 to 125 mm 25 to 75 mm 25 to 50 mm 50 to 100 mm 30 to 125 mm 25 to 75 mm 25 to 50 mm ANSWER DOWNLOAD EXAMIANS APP