Building Construction Which one of the following activities is not correct as applicable to brick corbels Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction For brick construction, the lime-sand mortar, is 1 : 3 1 : 2 1 : 4 1 : 1 1 : 3 1 : 2 1 : 4 1 : 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement made to support an unsafe structure temporarily, is known as Jacking Shoring Underpinning Scaffolding Jacking Shoring Underpinning Scaffolding ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 25 mm 65 mm 40 mm 100 mm 25 mm 65 mm 40 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil, may be improved by Compaction Grouting Drainage Chemical action Compaction Grouting Drainage Chemical action ANSWER DOWNLOAD EXAMIANS APP
Building Construction The floor is rubbed with oxalic acid, for making its surface Glossy Uniform Durable Free from voids Glossy Uniform Durable Free from voids ANSWER DOWNLOAD EXAMIANS APP