Building Construction In flat roof of reinforced cement concrete, the recommended angle of slope, is 200° A few degrees Zero 10° 200° A few degrees Zero 10° ANSWER DOWNLOAD EXAMIANS APP
Building Construction Gravels Vary in size between 2 to 20 mm Never swell when they come into contact with water All listed here Are cohesionless aggregates Vary in size between 2 to 20 mm Never swell when they come into contact with water All listed here Are cohesionless aggregates ANSWER DOWNLOAD EXAMIANS APP
Building Construction The arrangement of supporting an existing structure by providing supports underneath, is known as Shoring Jacking Underpinning Piling Shoring Jacking Underpinning Piling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 14 days 4 days 1 day 7 days 14 days 4 days 1 day 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Ornamental moulded course placed on the top of a wall, is Lintel Coping Cornice Frieze Lintel Coping Cornice Frieze ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level ANSWER DOWNLOAD EXAMIANS APP