Building Construction The range of spread from the wall base to outer edge of a brick work foundation does not exceed 2 horizontals to 1 vertical 1 horizontal to 1 vertical 2/3 horizontal to 1 vertical 1/2 horizontal to 1 vertical 2 horizontals to 1 vertical 1 horizontal to 1 vertical 2/3 horizontal to 1 vertical 1/2 horizontal to 1 vertical ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 65 mm 100 mm 40 mm 25 mm 65 mm 100 mm 40 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 4 days 14 days 1 day 7 days 4 days 14 days 1 day ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: None of these Igneous rock Sedimentary rock Metamorphic rock None of these Igneous rock Sedimentary rock Metamorphic rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction While designing a stair, the product of rise and going is approximately kept equal to 350 450 420 500 350 450 420 500 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Number of vertical joints in a stretcher course is x times the number of joints in the header course, where x is equal to 1/4 1 1/2 2 1/4 1 1/2 2 ANSWER DOWNLOAD EXAMIANS APP