Building Construction The lower half portion between crown and skew back of the arch, is called Spandril Springing Haunch Soffit Spandril Springing Haunch Soffit ANSWER DOWNLOAD EXAMIANS APP
Building Construction The portion of a brick cut across the width, is called Closer Bat Bed Half brick Closer Bat Bed Half brick ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 18 12 24 25 18 12 24 25 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of pointing in which upper side of mortar joints is kept about 12 mm inside the face of the masonry and bottom is kept flushed with face of wall, is Grooved pointing Recessed pointing Struck pointing Truck pointing Grooved pointing Recessed pointing Struck pointing Truck pointing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The art of bringing the floor to a true level surface by means of screeds, is called Topping Screeding Bedding None of these Topping Screeding Bedding None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger borings are not common In cohesive soils None of these In soils that require lateral support In soft soils In cohesive soils None of these In soils that require lateral support In soft soils ANSWER DOWNLOAD EXAMIANS APP