Building Construction The lower half portion between crown and skew back of the arch, is called Haunch Soffit Spandril Springing Haunch Soffit Spandril Springing ANSWER DOWNLOAD EXAMIANS APP
Building Construction For a wall carrying heavy load on low bearing capacity soil, Lean concrete bed is provided Both (A) and (C) of the above Reinforced concrete bed is provided Thick concrete bed is provided Lean concrete bed is provided Both (A) and (C) of the above Reinforced concrete bed is provided Thick concrete bed is provided ANSWER DOWNLOAD EXAMIANS APP
Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then d = 0.557 a None of these d = 0.775 a d = 0.445 a d = 0.557 a None of these d = 0.775 a d = 0.445 a ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum number of steps in a flight should generally be restricted to 12 10 15 No limit 12 10 15 No limit ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple roof is used for spans 6.5 m but less than 8 m 3.5 m but less than 5 m 5 m but less than 6.5 m 3.5 m or less 6.5 m but less than 8 m 3.5 m but less than 5 m 5 m but less than 6.5 m 3.5 m or less ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of Raymond pile Diameter of pile at bottom varies from 20 cm to 28 cm Diameter of top of piles varies from 40 cm to 60 cm Lengths vary from 6 m to 12 m All listed here Diameter of pile at bottom varies from 20 cm to 28 cm Diameter of top of piles varies from 40 cm to 60 cm Lengths vary from 6 m to 12 m All listed here ANSWER DOWNLOAD EXAMIANS APP