Building Construction The lower half portion between crown and skew back of the arch, is called Soffit Springing Spandril Haunch Soffit Springing Spandril Haunch ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stepped structure provided for lateral support of a structure, is Retaining wall Buttress Breast wall Parapet wall Retaining wall Buttress Breast wall Parapet wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 30 to 45 cm 5 to 10 cm 15 to 20 cm 25 to 30 cm 30 to 45 cm 5 to 10 cm 15 to 20 cm 25 to 30 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: Metamorphic rock None of these Sedimentary rock Igneous rock Metamorphic rock None of these Sedimentary rock Igneous rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction In clay soil Differential settlement is generally prevalent Swelling and shrinkage characteristics prevail Consolidation continues even after several years of construction All listed here Differential settlement is generally prevalent Swelling and shrinkage characteristics prevail Consolidation continues even after several years of construction All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction In soft clay of low bearing capacity, the type of steel pile generally used, is Pipe pile H-pile Screw pile Disc pile Pipe pile H-pile Screw pile Disc pile ANSWER DOWNLOAD EXAMIANS APP