Building Construction The lower half portion between crown and skew back of the arch, is called Springing Soffit Haunch Spandril Springing Soffit Haunch Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 25 mm 65 mm 40 mm 100 mm 25 mm 65 mm 40 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of ashlar masonry in which stones are finely chisel dressed and thickness of joints does not exceed 3 mm, is Ashlar facing masonry Chamfered ashlar masonry Random coursed ashlar masonry Coursed ashlar masonry Ashlar facing masonry Chamfered ashlar masonry Random coursed ashlar masonry Coursed ashlar masonry ANSWER DOWNLOAD EXAMIANS APP
Building Construction In flat roof of reinforced cement concrete, the recommended angle of slope, is Zero 10° 200° A few degrees Zero 10° 200° A few degrees ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 4 days 14 days 1 day 7 days 4 days 14 days 1 day 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The entrained concrete is used in lining walls and roofs for making Neither (A) nor (B) Heat insulated Both (A) and (B) Sound insulated Neither (A) nor (B) Heat insulated Both (A) and (B) Sound insulated ANSWER DOWNLOAD EXAMIANS APP