Building Construction To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as Header Stretcher Closer Bat Header Stretcher Closer Bat ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Chips floor Mosaic floor Terrazzo floor Marble floor Chips floor Mosaic floor Terrazzo floor Marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept 10 cm Equal to its projection beyond wall base 15 cm Less than its projection beyond wall base 10 cm Equal to its projection beyond wall base 15 cm Less than its projection beyond wall base ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 30° 0° 90° 60° 30° 0° 90° 60° ANSWER DOWNLOAD EXAMIANS APP
Building Construction In English garden wall bond The middle course of stretchers is started with a header to give proper vertical joints Queen closer in provided in each heading course All of these One course of headers to three or five course of stretchers The middle course of stretchers is started with a header to give proper vertical joints Queen closer in provided in each heading course All of these One course of headers to three or five course of stretchers ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dampness causes Growth of termites Bleaching of paints Crumbling of plaster Efflorescence Growth of termites Bleaching of paints Crumbling of plaster Efflorescence ANSWER DOWNLOAD EXAMIANS APP