Building Construction Auger boring Is most economical up-to a depth of 5 meters Is generally employed in cohesive and other self soils above water table Is the most primitive method for making a hole in the ground All of these Is most economical up-to a depth of 5 meters Is generally employed in cohesive and other self soils above water table Is the most primitive method for making a hole in the ground All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth or height of the arch is the Vertical distance between springing line and intrados Perpendicular distance between intrados and extrados Perpendicular distance between springing line and extrados None of these Vertical distance between springing line and intrados Perpendicular distance between intrados and extrados Perpendicular distance between springing line and extrados None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction In which of the following pairs both trees yield soft wood? Chir and sal Chir and deodar Deodar and Shishum Sal and teak Chir and sal Chir and deodar Deodar and Shishum Sal and teak ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lintels are preferred to arches because Arches require more headroom to span the openings like doors, windows etc. Arches are difficult in construction All of these Arches require strong abutments to withstand arch thrust Arches require more headroom to span the openings like doors, windows etc. Arches are difficult in construction All of these Arches require strong abutments to withstand arch thrust ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 25 mm 45 mm 35 mm 15 mm 25 mm 45 mm 35 mm 15 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided on a sloping roof of a building, is called Dormer window Rash window Louvered window Lantern window Dormer window Rash window Louvered window Lantern window ANSWER DOWNLOAD EXAMIANS APP