Building Construction Auger boring Is most economical up-to a depth of 5 meters Is the most primitive method for making a hole in the ground All of these Is generally employed in cohesive and other self soils above water table Is most economical up-to a depth of 5 meters Is the most primitive method for making a hole in the ground All of these Is generally employed in cohesive and other self soils above water table ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Placing of concrete Compaction of concrete Curing of concrete Finishing of concrete Placing of concrete Compaction of concrete Curing of concrete Finishing of concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction The nominal thickness of one brick wall in mm, is 150 mm 90 mm 200 mm 190 mm 150 mm 90 mm 200 mm 190 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The triangular portion between any two adjacent arches and the tangent to their crowns, is Rise Soffit Haunch Spandril Rise Soffit Haunch Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than h 2 h 1/2h h/4 h 2 h 1/2h h/4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of pointing in which upper side of mortar joints is kept about 12 mm inside the face of the masonry and bottom is kept flushed with face of wall, is Grooved pointing Truck pointing Struck pointing Recessed pointing Grooved pointing Truck pointing Struck pointing Recessed pointing ANSWER DOWNLOAD EXAMIANS APP