Building Construction The vertical members fixed between steps and hand rail, are known Balusters Soffits Newel posts Strings Balusters Soffits Newel posts Strings ANSWER DOWNLOAD EXAMIANS APP
Building Construction For plastering the exposed brick walls, the cement sand mortar should be 1 : 3 1 : 6 1 : 2 1 : 4 1 : 3 1 : 6 1 : 2 1 : 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Brick nogging type of partition wall, is constructed by Constructing brick work within a wooden framework Laying bricks as headers in cement mortar Reinforcing brick wall with iron straps Laying bricks as stretchers in cement mortar Constructing brick work within a wooden framework Laying bricks as headers in cement mortar Reinforcing brick wall with iron straps Laying bricks as stretchers in cement mortar ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided on a sloping roof of a building, is called Louvered window Rash window Dormer window Lantern window Louvered window Rash window Dormer window Lantern window ANSWER DOWNLOAD EXAMIANS APP
Building Construction A pre-stressed concrete pile is Easy to handle Lighter in weight All of these Extremely durable Easy to handle Lighter in weight All of these Extremely durable ANSWER DOWNLOAD EXAMIANS APP
Building Construction The horizontal timber piece provided at the apex of a roof truss which supports the common rafter is called Hip rafter Eaves board Ridge board Valley rafter Hip rafter Eaves board Ridge board Valley rafter ANSWER DOWNLOAD EXAMIANS APP