Building Construction The vertical members fixed between steps and hand rail, are known Newel posts Balusters Strings Soffits Newel posts Balusters Strings Soffits ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of an arch is the distance between Crown and ground level Crown and springing line Intrados and extrados Ground level and springing line Crown and ground level Crown and springing line Intrados and extrados Ground level and springing line ANSWER DOWNLOAD EXAMIANS APP
Building Construction Vertical construction joints are provided where the shearing forces are minimum in the case of Slabs Beams All of these Girders Slabs Beams All of these Girders ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Simplex pile Franki pile Pressure pile Vibro pile Simplex pile Franki pile Pressure pile Vibro pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 25 mm 35 mm 15 mm 45 mm 25 mm 35 mm 15 mm 45 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Number of vertical joints in a stretcher course is x times the number of joints in the header course, where x is equal to 1/4 1 1/2 2 1/4 1 1/2 2 ANSWER DOWNLOAD EXAMIANS APP