Building Construction The depth of concrete bed of the foundation depends upon The mix of the concrete All listed here The projection of the concrete block beyond the footing over it The upward soil pressure The mix of the concrete All listed here The projection of the concrete block beyond the footing over it The upward soil pressure ANSWER DOWNLOAD EXAMIANS APP
Building Construction In verandah (corridor) floors outward slope is 1 in 40 1 in 50 1 in 60 1 in 70 1 in 40 1 in 50 1 in 60 1 in 70 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Franki pile Pressure pile Simplex pile Vibro pile Franki pile Pressure pile Simplex pile Vibro pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of multi-storeyed buildings, the forms to be removed first are Column forms All the above at the same time Sides of beams and girders Bottom of beams and girders Column forms All the above at the same time Sides of beams and girders Bottom of beams and girders ANSWER DOWNLOAD EXAMIANS APP
Building Construction The art of bringing the floor to a true level surface by means of screeds, is called Topping Screeding None of these Bedding Topping Screeding None of these Bedding ANSWER DOWNLOAD EXAMIANS APP
Building Construction For brick construction, the lime-sand mortar, is 1 : 2 1 : 1 1 : 4 1 : 3 1 : 2 1 : 1 1 : 4 1 : 3 ANSWER DOWNLOAD EXAMIANS APP