Building Construction In the construction of arches, sand box method is used for Striking of centring None of these Actual laying of arch work Centring Striking of centring None of these Actual laying of arch work Centring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower edge of the pitched roof, from where the rain water of the roof surface drops down, is known as Hip Ridge Eaves Gable Hip Ridge Eaves Gable ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 45 mm 25 mm 15 mm 35 mm 45 mm 25 mm 15 mm 35 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Upto roof above ground level Between ceiling and floor level Between ceiling and ground level Upto ceiling from the ground level Upto roof above ground level Between ceiling and floor level Between ceiling and ground level Upto ceiling from the ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for columns, is 50 to 100 mm 75 to 125 mm 25 to 75 mm 25 to 50 mm 50 to 100 mm 75 to 125 mm 25 to 75 mm 25 to 50 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 4 days 7 days 14 days 1 day 4 days 7 days 14 days 1 day ANSWER DOWNLOAD EXAMIANS APP