• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Building Construction

Building Construction
In the construction of arches, sand box method is used for

None of these
Centring
Striking of centring
Actual laying of arch work

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The concrete slump recommended for beams and slabs; is

25 to 50 mm
50 to 100 mm
30 to 125 mm
25 to 75 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The thickness of a reinforced brick partition wall, is generally kept

20 cm
5 cm
10 cm
15 cm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Herringbone bond is used for

All of these
Walls having thickness more than 4 bricks
Architectural finish to the face work
Ornamental panels in brick flooring

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The vertical sides of a door and window openings provided in a wall, are known as

Jambs
Reveals
None of these
Verticals

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form Work including the props can be removed from beams, only after

14 days
7 days
3 days
21 days

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑