Building Construction

Building Construction
In the construction of arches, sand box method is used for

Striking of centring
None of these
Actual laying of arch work
Centring

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The lower edge of the pitched roof, from where the rain water of the roof surface drops down, is known as

Hip
Ridge
Eaves
Gable

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to

45 mm
25 mm
15 mm
35 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The ceiling height of a building is

Upto roof above ground level
Between ceiling and floor level
Between ceiling and ground level
Upto ceiling from the ground level

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The concrete slump recommended for columns, is

50 to 100 mm
75 to 125 mm
25 to 75 mm
25 to 50 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form work from the sides of beams can be removed only after

4 days
7 days
14 days
1 day

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑