In the method of tube boring of soil investigation, the following is essential:

A flap valve at the bottom of tube is provided to extract the soil sample
All listed here
A tube of about 2 meters length and 20 cm diameter with a cutting edge
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Mansard roof is a roof which slopes in

Two directions with break in the slope on each side
Two directions without break in the slope on each side
Four directions without break in the slope on each side
Four directions with break in the slope on each side

ANSWER DOWNLOAD EXAMIANS APP