Building Construction The maximum permissible deflection of a timber beam supporting a roof, is L/150 L/260 L/100 L/360 L/150 L/260 L/100 L/360 ANSWER DOWNLOAD EXAMIANS APP
Building Construction During percussion drilling All listed here The soil to a considerable depth below the bottom of the hole gets disturbed Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole Caving or mixing of strata are caused in soft soils or cohesion-less soils All listed here The soil to a considerable depth below the bottom of the hole gets disturbed Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole Caving or mixing of strata are caused in soft soils or cohesion-less soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundations are suitable for Soft rocks Water logged soils Compact soils Multi-storeyed buildings Soft rocks Water logged soils Compact soils Multi-storeyed buildings ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling is the fastest method in case of Clay soils Sandy soil Rocky soils All of these Clay soils Sandy soil Rocky soils All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction A cut in frame of a door to receive the shutter, is called Horn Louver Stop Rebate Horn Louver Stop Rebate ANSWER DOWNLOAD EXAMIANS APP
Building Construction The member which is placed horizontally to support common rafter of a sloping roof, is Strut Cleat Batten Purlin Strut Cleat Batten Purlin ANSWER DOWNLOAD EXAMIANS APP