Building Construction The minimum depth of foundation in clayey soils is 1.2 m 0.9 m 0.7 m 0.5 m 1.2 m 0.9 m 0.7 m 0.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The predominant constituent which is responsible for strength in granite is Quartz Felspar Mica None of these Quartz Felspar Mica None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil can be improved by Increasing the depth of foundation Draining the soil Grouting Compacting the soil Increasing the depth of foundation Draining the soil Grouting Compacting the soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil, may be improved by Grouting Compaction Chemical action Drainage Grouting Compaction Chemical action Drainage ANSWER DOWNLOAD EXAMIANS APP
Building Construction Bearing capacity of soils cannot be improved by Ramming crushed stone in soil Draining sub-soil water Driving sand piles Watering surface of soil Ramming crushed stone in soil Draining sub-soil water Driving sand piles Watering surface of soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple close roof is suitable for maximum span of 2.5 m 3.5 m 5.5 m 4.5 m 2.5 m 3.5 m 5.5 m 4.5 m ANSWER DOWNLOAD EXAMIANS APP