The minimum depth of foundation in clayey soils is

0.7 m
0.5 m
0.9 m
1.2 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to

45 mm
25 mm
15 mm
35 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form work from the sides of beams can be removed only after

1 day
4 days
14 days
7 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Which of the following metal sheets is most effective in preventing dampness?

Aluminium sheets
All listed here
Copper sheets
Lead sheets

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
If (φ) is the angle of repose of soil of weight w kg/m3, the horizontal pressure p at a depth of h meters per metre length of wall, is

wh × √[(1 - sin φ)/(1 + sin φ)]
wh × [(1 - sin φ)/(1 + sin φ)]
wh × √[(1 + sin φ)/(1 - sin φ)]
(wh/2) × [(1 - sin φ)/(1 + sin φ)]

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
According to National Building Code, the hydrants in water mains is provided at minimum interval of

75 m
60 m
50 m
90 m

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑