Building Construction
Bearing capacity of soils cannot be improved by

Driving sand piles
Watering surface of soil
Ramming crushed stone in soil
Draining sub-soil water

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In the method of tube boring of soil investigation, the following is essential:

A tube of about 2 meters length and 20 cm diameter with a cutting edge
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand
A flap valve at the bottom of tube is provided to extract the soil sample
All listed here