Building Construction The Auger boring method is not suitable for Vary soft soil Cemented soil Very hard soil All of these Vary soft soil Cemented soil Very hard soil All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Crown is located at Highest point on the extrados of the arch Skew-back of the arch None of these Highest point on the intrados of the arch Highest point on the extrados of the arch Skew-back of the arch None of these Highest point on the intrados of the arch ANSWER DOWNLOAD EXAMIANS APP
Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Eave Crown Ridge Rafter Eave Crown Ridge Rafter ANSWER DOWNLOAD EXAMIANS APP
Building Construction The dimensions of a half queen closer, are 9 cm × 9 cm × 9 cm 9 cm × 9 cm × 4.5 cm 9 cm × 4.5 cm × 9 cm 1.8 cm × 4.5 cm × 9 cm 9 cm × 9 cm × 9 cm 9 cm × 9 cm × 4.5 cm 9 cm × 4.5 cm × 9 cm 1.8 cm × 4.5 cm × 9 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than 1/2h h 2 h h/4 1/2h h 2 h h/4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The mortar in which both cement and lime are used as binding materials, is called Fire resistant mortar Lime mortar Gauged mortar Cement mortar Fire resistant mortar Lime mortar Gauged mortar Cement mortar ANSWER DOWNLOAD EXAMIANS APP