Building Construction In any good staircase, the maximum and minimum pitch respectively should be 90° and 0° 60° and 10° 75° and 30° 40° and 25° 90° and 0° 60° and 10° 75° and 30° 40° and 25° ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: Metamorphic rock Sedimentary rock None of these Igneous rock Metamorphic rock Sedimentary rock None of these Igneous rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction While designing a stair, the product of rise and going is approximately kept equal to 420 500 350 450 420 500 350 450 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of pile which is driven at an inclination to resist inclined forces is known as Batter pile Anchor pile Sheet pile Friction pile Batter pile Anchor pile Sheet pile Friction pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for foundations, is 75 to 125 mm 50 to 100 mm 30 to 125 mm 25 to 50 mm 75 to 125 mm 50 to 100 mm 30 to 125 mm 25 to 50 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Cavity wall is generally provided for All of these Prevention of dampness Heat insulation Sound insulation All of these Prevention of dampness Heat insulation Sound insulation ANSWER DOWNLOAD EXAMIANS APP