Building Construction In any good staircase, the maximum and minimum pitch respectively should be 75° and 30° 90° and 0° 60° and 10° 40° and 25° 75° and 30° 90° and 0° 60° and 10° 40° and 25° ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical members fixed between steps and hand rail, are known Soffits Strings Balusters Newel posts Soffits Strings Balusters Newel posts ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling is the fastest method in case of Sandy soil All of these Clay soils Rocky soils Sandy soil All of these Clay soils Rocky soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 65 to 100 mm 25 mm 40 to 65 mm 25 to 40 mm 65 to 100 mm 25 mm 40 to 65 mm 25 to 40 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angular steps used for changing direction of the stairs, are called Winders Round steps Angular steps Radial steps Winders Round steps Angular steps Radial steps ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Between ceiling and floor level Upto ceiling from the ground level Upto roof above ground level Between ceiling and ground level Between ceiling and floor level Upto ceiling from the ground level Upto roof above ground level Between ceiling and ground level ANSWER DOWNLOAD EXAMIANS APP