Building Construction

Building Construction
In any good staircase, the maximum and minimum pitch respectively should be

75° and 30°
90° and 0°
60° and 10°
40° and 25°

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The vertical members fixed between steps and hand rail, are known

Soffits
Strings
Balusters
Newel posts

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Rotary drilling is the fastest method in case of

Sandy soil
All of these
Clay soils
Rocky soils

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The maximum total settlement for raft foundation on clayey soils should be limited to

65 to 100 mm
25 mm
40 to 65 mm
25 to 40 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The angular steps used for changing direction of the stairs, are called

Winders
Round steps
Angular steps
Radial steps

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The ceiling height of a building is

Between ceiling and floor level
Upto ceiling from the ground level
Upto roof above ground level
Between ceiling and ground level

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑