Building Construction The triangular space formed between the extrados and the horizontal line drawn through the crown of an arch is known as Skewbacks Voussoirs Spandril Haunch Skewbacks Voussoirs Spandril Haunch ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 45 mm 35 mm 15 mm 25 mm 45 mm 35 mm 15 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 10 % 25 % 20 % 15 % 10 % 25 % 20 % 15 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 25 mm 65 mm 100 mm 40 mm 25 mm 65 mm 100 mm 40 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The opening provided in sloping roof with its top parallel to the roof surface, is called Lantern window Dormer window Louvered window Sky light window Lantern window Dormer window Louvered window Sky light window ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth or height of the arch is the Perpendicular distance between intrados and extrados None of these Vertical distance between springing line and intrados Perpendicular distance between springing line and extrados Perpendicular distance between intrados and extrados None of these Vertical distance between springing line and intrados Perpendicular distance between springing line and extrados ANSWER DOWNLOAD EXAMIANS APP