Building Construction The triangular space formed between the extrados and the horizontal line drawn through the crown of an arch is known as Voussoirs Skewbacks Haunch Spandril Voussoirs Skewbacks Haunch Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction Weep holes are provided in retaining and breast walls To drain off the water from the filling To increase compaction of the earth retained To ventilate the stone masonry To add architectural beauty To drain off the water from the filling To increase compaction of the earth retained To ventilate the stone masonry To add architectural beauty ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/12th of the span 1/6th of the span 1/8th of the span 1/10th of the span 1/12th of the span 1/6th of the span 1/8th of the span 1/10th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction Bearing capacity of soils cannot be improved by Draining sub-soil water Ramming crushed stone in soil Watering surface of soil Driving sand piles Draining sub-soil water Ramming crushed stone in soil Watering surface of soil Driving sand piles ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical sides of a door and window openings provided in a wall, are known as Reveals Verticals None of these Jambs Reveals Verticals None of these Jambs ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as Half king closer Bevelled closer Queen closer King closer Half king closer Bevelled closer Queen closer King closer ANSWER DOWNLOAD EXAMIANS APP