Building Construction The triangular space formed between the extrados and the horizontal line drawn through the crown of an arch is known as Haunch Spandril Skewbacks Voussoirs Haunch Spandril Skewbacks Voussoirs ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Terrazzo floor Chips floor Marble floor Mosaic floor Terrazzo floor Chips floor Marble floor Mosaic floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 14 days 1 day 4 days 7 days 14 days 1 day 4 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction In verandah (corridor) floors outward slope is 1 in 50 1 in 70 1 in 60 1 in 40 1 in 50 1 in 70 1 in 60 1 in 40 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the commonly adopted geophysical method in civil engineering from the following: Both (A) and (B) of the above Gravitational method The seismic method Electrical resistivity method Both (A) and (B) of the above Gravitational method The seismic method Electrical resistivity method ANSWER DOWNLOAD EXAMIANS APP