Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 24 25 12 18 24 25 12 18 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 0° 60° 90° 30° 0° 60° 90° 30° ANSWER DOWNLOAD EXAMIANS APP
Building Construction Bearing capacity of soils cannot be improved by Draining sub-soil water Driving sand piles Ramming crushed stone in soil Watering surface of soil Draining sub-soil water Driving sand piles Ramming crushed stone in soil Watering surface of soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 25 mm 40 mm 65 mm 100 mm 25 mm 40 mm 65 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction To support a heavy structure in sandy soil, the type of foundation generally used, is Combined footing Pier footing Raft footing Strap footing Combined footing Pier footing Raft footing Strap footing ANSWER DOWNLOAD EXAMIANS APP