Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 18 25 24 12 18 25 24 12 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Vertical construction joints are provided where the shearing forces are minimum in the case of Slabs Girders Beams All of these Slabs Girders Beams All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundations are placed below ground level, to increase Workability All listed here Strength Stability of structure Workability All listed here Strength Stability of structure ANSWER DOWNLOAD EXAMIANS APP
Building Construction The range of spread from the wall base to outer edge of a brick work foundation does not exceed 1/2 horizontal to 1 vertical 2 horizontals to 1 vertical 1 horizontal to 1 vertical 2/3 horizontal to 1 vertical 1/2 horizontal to 1 vertical 2 horizontals to 1 vertical 1 horizontal to 1 vertical 2/3 horizontal to 1 vertical ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Compaction of concrete Placing of concrete Curing of concrete Finishing of concrete Compaction of concrete Placing of concrete Curing of concrete Finishing of concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 25 to 30 cm 5 to 10 cm 30 to 45 cm 15 to 20 cm 25 to 30 cm 5 to 10 cm 30 to 45 cm 15 to 20 cm ANSWER DOWNLOAD EXAMIANS APP