Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 18 24 25 12 18 24 25 12 ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 1, 2, 3, 4, 5 3, 2, 5, 1, 4 2, 1, 3, 5, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 3, 2, 5, 1, 4 2, 1, 3, 5, 4 5, 4, 3, 2, 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Simplex pile Vibro pile Pressure pile Franki pile Simplex pile Vibro pile Pressure pile Franki pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction A projecting piece usually provided to support a truss, is Lintel Coping Cornice Frieze Lintel Coping Cornice Frieze ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundations are suitable for Water logged soils Compact soils Multi-storeyed buildings Soft rocks Water logged soils Compact soils Multi-storeyed buildings Soft rocks ANSWER DOWNLOAD EXAMIANS APP
Building Construction A covering of concrete placed on the exposed top of an external wall, is known as Frieze Lintel Coping Cornice Frieze Lintel Coping Cornice ANSWER DOWNLOAD EXAMIANS APP