Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 12 18 24 25 12 18 24 25 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used Pedestal pile Franki pile Pressure pile Vibro pile Pedestal pile Franki pile Pressure pile Vibro pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.35 du 1.25 du 1.5 du 1.75 du 1.35 du 1.25 du 1.5 du 1.75 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction In horizontal D.P.C, thickness of cement concrete (1 : 2 : 4) is 8 cm 2 cm 6 cm 4 cm 8 cm 2 cm 6 cm 4 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Assertion A : Shishum is used for decorative woodwork.Reason R : Shishum can be polished to an excellent finish.Select your answer according to the coding system given below: A is true but R is false Both A and R is true but R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is false but R is true A is true but R is false Both A and R is true but R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is false but R is true ANSWER DOWNLOAD EXAMIANS APP
Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 10 m 15 m 5 m 20 m 10 m 15 m 5 m 20 m ANSWER DOWNLOAD EXAMIANS APP