Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 12 24 25 18 12 24 25 18 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Extrados Intrados Spandril Rise Extrados Intrados Spandril Rise ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of granite is generally 15 to 20 kg/cm² 40 to 45 kg/cm² 30 to 35 kg/cm² 5 to 10 kg/cm² 15 to 20 kg/cm² 40 to 45 kg/cm² 30 to 35 kg/cm² 5 to 10 kg/cm² ANSWER DOWNLOAD EXAMIANS APP
Building Construction The art of bringing the floor to a true level surface by means of screeds, is called None of these Screeding Bedding Topping None of these Screeding Bedding Topping ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: All listed here Area of footing slab = 11.00 m2 The length of the foundation slab = 7.00 m Distance of C.G. of the loads from the smaller column = 3.00 m All listed here Area of footing slab = 11.00 m2 The length of the foundation slab = 7.00 m Distance of C.G. of the loads from the smaller column = 3.00 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 20 % 10 % 15 % 25 % 20 % 10 % 15 % 25 % ANSWER DOWNLOAD EXAMIANS APP