If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is

18
24
12
25

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The radial splits which are wider on the outside of the log and narrower towards the pith are known as

Heart shakes
Starshakes
Rindgalls
Cupshakes

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The type of pointing in which upper side of mortar joints is kept about 12 mm inside the face of the masonry and bottom is kept flushed with face of wall, is

Grooved pointing
Truck pointing
Struck pointing
Recessed pointing

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
While investigating the site, a thick layer of fairly firm clay over a deep layer of soft clay is encountered. In such a situation, the following type of foundation is useful:

Raft foundation
None of these
Grillage foundation
Pile formation

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For plastering the exposed brick walls, the cement sand mortar should be

1 : 6
1 : 4
1 : 2
1 : 3

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
According to National Building Code, the hydrants in water mains is provided at minimum interval of

60 m
50 m
90 m
75 m

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑