Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 18 24 12 25 18 24 12 25 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The radial splits which are wider on the outside of the log and narrower towards the pith are known as Heart shakes Starshakes Rindgalls Cupshakes Heart shakes Starshakes Rindgalls Cupshakes ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of pointing in which upper side of mortar joints is kept about 12 mm inside the face of the masonry and bottom is kept flushed with face of wall, is Grooved pointing Truck pointing Struck pointing Recessed pointing Grooved pointing Truck pointing Struck pointing Recessed pointing ANSWER DOWNLOAD EXAMIANS APP
Building Construction While investigating the site, a thick layer of fairly firm clay over a deep layer of soft clay is encountered. In such a situation, the following type of foundation is useful: Raft foundation None of these Grillage foundation Pile formation Raft foundation None of these Grillage foundation Pile formation ANSWER DOWNLOAD EXAMIANS APP
Building Construction For plastering the exposed brick walls, the cement sand mortar should be 1 : 6 1 : 4 1 : 2 1 : 3 1 : 6 1 : 4 1 : 2 1 : 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to National Building Code, the hydrants in water mains is provided at minimum interval of 60 m 50 m 90 m 75 m 60 m 50 m 90 m 75 m ANSWER DOWNLOAD EXAMIANS APP