Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 25 18 24 12 25 18 24 12 ANSWER DOWNLOAD EXAMIANS APP
Building Construction During percussion drilling Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole The soil to a considerable depth below the bottom of the hole gets disturbed All listed here Caving or mixing of strata are caused in soft soils or cohesion-less soils Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole The soil to a considerable depth below the bottom of the hole gets disturbed All listed here Caving or mixing of strata are caused in soft soils or cohesion-less soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The differential settlement in case of foundations on sandy soils should not exceed 25 mm 40 mm 65 mm 100 mm 25 mm 40 mm 65 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pitched and sloping roofs are suitable for Plain regions All of these Covering large areas Coastal regions Plain regions All of these Covering large areas Coastal regions ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of joint commonly used at the junction of a principal rafter and tie beam in timber trusses is Mortise and tenon joint Butt joint Oblique mortise and tenon joint Mitred joint Mortise and tenon joint Butt joint Oblique mortise and tenon joint Mitred joint ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile which is provided with a bulb filled with concrete at its lower end, is known as Simplex pile Mac-Arthur pile Franki pile Raymond pile Simplex pile Mac-Arthur pile Franki pile Raymond pile ANSWER DOWNLOAD EXAMIANS APP