Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 12 25 18 24 12 25 18 24 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Single Flemish bond consists of English bond facing and double Flemish bond backing in each course Stretcher bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course Double Flemish bond facing and English bond backing in each course English bond facing and double Flemish bond backing in each course Stretcher bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course Double Flemish bond facing and English bond backing in each course ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statements from the following: Cracks appear on the plastered surface in the form of hair cracks All listed here In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Excessive thermal variations in the backing or plaster causes the plaster to fall Cracks appear on the plastered surface in the form of hair cracks All listed here In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Excessive thermal variations in the backing or plaster causes the plaster to fall ANSWER DOWNLOAD EXAMIANS APP
Building Construction Auger boring Is most economical up-to a depth of 5 meters All of these Is the most primitive method for making a hole in the ground Is generally employed in cohesive and other self soils above water table Is most economical up-to a depth of 5 meters All of these Is the most primitive method for making a hole in the ground Is generally employed in cohesive and other self soils above water table ANSWER DOWNLOAD EXAMIANS APP
Building Construction The local swelling of a finished plaster, is termed Cracking Hacking Dubbing Blistering Cracking Hacking Dubbing Blistering ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 40 to 65 mm 25 to 40 mm 25 mm 65 to 100 mm 40 to 65 mm 25 to 40 mm 25 mm 65 to 100 mm ANSWER DOWNLOAD EXAMIANS APP