Building Construction

Building Construction
The projections of head or sill of a door or window frame are

Chocks
Transoms
Stops
Horns

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The loose pockets in soil mass can be bridged safely by providing a raft foundation provided the soft area is smaller than

Half the column spacing
Three-fourth the column spacing
One-third the column spacing
The column spacing

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
A solid core of rock is formed inside the cylinder in the case of

Percussion drilling
Diamond drilling
Wash boring
Auger boring

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is

12
18
24
25

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is

3, 2, 5, 1, 4
1, 2, 3, 4, 5
5, 4, 3, 2, 1
2, 1, 3, 5, 4

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Suitable spacing of timber piles, is

90 cm
70 cm
100 cm
80 cm

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑