Building Construction The projections of head or sill of a door or window frame are Chocks Transoms Stops Horns Chocks Transoms Stops Horns ANSWER DOWNLOAD EXAMIANS APP
Building Construction The loose pockets in soil mass can be bridged safely by providing a raft foundation provided the soft area is smaller than Half the column spacing Three-fourth the column spacing One-third the column spacing The column spacing Half the column spacing Three-fourth the column spacing One-third the column spacing The column spacing ANSWER DOWNLOAD EXAMIANS APP
Building Construction A solid core of rock is formed inside the cylinder in the case of Percussion drilling Diamond drilling Wash boring Auger boring Percussion drilling Diamond drilling Wash boring Auger boring ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 12 18 24 25 12 18 24 25 ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 3, 2, 5, 1, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 2, 1, 3, 5, 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Suitable spacing of timber piles, is 90 cm 70 cm 100 cm 80 cm 90 cm 70 cm 100 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP