Building Construction The projections of head or sill of a door or window frame are Horns Transoms Chocks Stops Horns Transoms Chocks Stops ANSWER DOWNLOAD EXAMIANS APP
Building Construction The width of the hollow space between two walls of a cavity wall should not exceed 5 cm 10 cm 7.5 cm 15 cm 5 cm 10 cm 7.5 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction While designing a stair, the product of rise and going is approximately kept equal to 350 500 450 420 350 500 450 420 ANSWER DOWNLOAD EXAMIANS APP
Building Construction As compared to English bond, double Flemish bond is Stronger More compact None of these Costly Stronger More compact None of these Costly ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of pointing in which a V-shaped projection outside the wall surface, is provided, is called Weather pointing Recessed pointing V-pointing Tuck pointing Weather pointing Recessed pointing V-pointing Tuck pointing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 65 mm 40 mm 100 mm 25 mm 65 mm 40 mm 100 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP