Building Construction For each storey (or, story) of a building, the depth of exploration should be 3 meters 2 meters 1 meter 4 meters 3 meters 2 meters 1 meter 4 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction The construction joints in buildings are provided after 10 m 20 m 15 m 40 m 10 m 20 m 15 m 40 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is Disc pile Screw pile H-pile Pipe pile Disc pile Screw pile H-pile Pipe pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Between ceiling and ground level Upto ceiling from the ground level Upto roof above ground level Between ceiling and floor level Between ceiling and ground level Upto ceiling from the ground level Upto roof above ground level Between ceiling and floor level ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the construction of arches, sand box method is used for Actual laying of arch work Striking of centring None of these Centring Actual laying of arch work Striking of centring None of these Centring ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the commonly adopted geophysical method in civil engineering from the following: Gravitational method Both (A) and (B) of the above Electrical resistivity method The seismic method Gravitational method Both (A) and (B) of the above Electrical resistivity method The seismic method ANSWER DOWNLOAD EXAMIANS APP