Building Construction For each storey (or, story) of a building, the depth of exploration should be 2 meters 4 meters 1 meter 3 meters 2 meters 4 meters 1 meter 3 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction For brick construction, the lime-sand mortar, is 1 : 3 1 : 4 1 : 2 1 : 1 1 : 3 1 : 4 1 : 2 1 : 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: Igneous rock Metamorphic rock Sedimentary rock None of these Igneous rock Metamorphic rock Sedimentary rock None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction For the construction of flyovers in sandy soils, the type of foundation provided, is Combined footing Raft footing Strap footing Pier footing Combined footing Raft footing Strap footing Pier footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The mortar in which both cement and lime are used as binding materials, is called Lime mortar Fire resistant mortar Cement mortar Gauged mortar Lime mortar Fire resistant mortar Cement mortar Gauged mortar ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct statements from the following: Excessive thermal variations in the backing or plaster causes the plaster to fall All listed here In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Cracks appear on the plastered surface in the form of hair cracks Excessive thermal variations in the backing or plaster causes the plaster to fall All listed here In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water Cracks appear on the plastered surface in the form of hair cracks ANSWER DOWNLOAD EXAMIANS APP