Building Construction For each storey (or, story) of a building, the depth of exploration should be 3 meters 4 meters 2 meters 1 meter 3 meters 4 meters 2 meters 1 meter ANSWER DOWNLOAD EXAMIANS APP
Building Construction The differential settlement in case of foundations on sandy soils should not exceed 40 mm 100 mm 65 mm 25 mm 40 mm 100 mm 65 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as Grouting Troweling Laying Placing Grouting Troweling Laying Placing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of working a flat for the finishing coat, is known Blistering Dubbing out Knitting Floating Blistering Dubbing out Knitting Floating ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Ranging rod Steel tape Levelling staff Boning rod Ranging rod Steel tape Levelling staff Boning rod ANSWER DOWNLOAD EXAMIANS APP
Building Construction Negative skin friction Develops due to lowering of ground water Both (A) and (B) Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile Neither (A) not (B) Develops due to lowering of ground water Both (A) and (B) Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile Neither (A) not (B) ANSWER DOWNLOAD EXAMIANS APP