Building Construction During percussion drilling All listed here Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole Caving or mixing of strata are caused in soft soils or cohesion-less soils The soil to a considerable depth below the bottom of the hole gets disturbed All listed here Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole Caving or mixing of strata are caused in soft soils or cohesion-less soils The soil to a considerable depth below the bottom of the hole gets disturbed ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger boring method is not suitable for Vary soft soil Cemented soil Very hard soil All of these Vary soft soil Cemented soil Very hard soil All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction Minimum width of landing should be Equal to width of stairs Twice the width of stairs Half the width of stairs One fourth the width of stairs Equal to width of stairs Twice the width of stairs Half the width of stairs One fourth the width of stairs ANSWER DOWNLOAD EXAMIANS APP
Building Construction Raft foundation are generally preferred to when the area required for individual footing, is more than 25% to total area 50% of total area 30% of total area 40% to total area 25% to total area 50% of total area 30% of total area 40% to total area ANSWER DOWNLOAD EXAMIANS APP
Building Construction The alignment of a cross joint along the plumb line is Bed block Vertical line Perpend Lintel Bed block Vertical line Perpend Lintel ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/6th of the span 1/8th of the span 1/10th of the span 1/12th of the span 1/6th of the span 1/8th of the span 1/10th of the span 1/12th of the span ANSWER DOWNLOAD EXAMIANS APP