Building Construction The lower edge of the pitched roof, from where the rain water of the roof surface drops down, is known as Eaves Gable Hip Ridge Eaves Gable Hip Ridge ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 15 to 20 cm 30 to 45 cm 25 to 30 cm 5 to 10 cm 15 to 20 cm 30 to 45 cm 25 to 30 cm 5 to 10 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 1, 2, 3, 4, 5 2, 1, 3, 5, 4 5, 4, 3, 2, 1 3, 2, 5, 1, 4 1, 2, 3, 4, 5 2, 1, 3, 5, 4 5, 4, 3, 2, 1 3, 2, 5, 1, 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction A wooden block hinged on post outside a door, is known Stop Cleat Horn None of these Stop Cleat Horn None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Simplex pile Vibro pile Pressure pile Franki pile Simplex pile Vibro pile Pressure pile Franki pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Marble floor Chips floor Terrazzo floor Mosaic floor Marble floor Chips floor Terrazzo floor Mosaic floor ANSWER DOWNLOAD EXAMIANS APP