Building Construction Arches in the form of masonry arcs struck from more than four centres, are called Two curved arches Ogee arches Drop gothic arches Gothic arches Two curved arches Ogee arches Drop gothic arches Gothic arches ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of flooring suitable for use in churches, theatres, public libraries and other places where noiseless floor covering is desired is Linoleum flooring Wooden flooring Glass flooring Cork flooring Linoleum flooring Wooden flooring Glass flooring Cork flooring ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling ANSWER DOWNLOAD EXAMIANS APP
Building Construction In soft clay of low bearing capacity, the type of steel pile generally used, is H-pile Pipe pile Disc pile Screw pile H-pile Pipe pile Disc pile Screw pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower edge of the pitched roof, from where the rain water of the roof surface drops down, is known as Gable Ridge Eaves Hip Gable Ridge Eaves Hip ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 5, 4, 3, 2, 1 1, 2, 3, 4, 5 2, 1, 3, 5, 4 3, 2, 5, 1, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 2, 1, 3, 5, 4 3, 2, 5, 1, 4 ANSWER DOWNLOAD EXAMIANS APP