Building Construction The concrete slump recommended for columns, is 25 to 50 mm 25 to 75 mm 50 to 100 mm 75 to 125 mm 25 to 50 mm 25 to 75 mm 50 to 100 mm 75 to 125 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The taper of precast concrete pile should not be more than 1 cm per metre length 4 cm per metre length 5 cm per metre length 2 cm per metre length 1 cm per metre length 4 cm per metre length 5 cm per metre length 2 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 15 m 5 m 10 m 20 m 15 m 5 m 10 m 20 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided on a sloping roof of a building, is called Louvered window Rash window Lantern window Dormer window Louvered window Rash window Lantern window Dormer window ANSWER DOWNLOAD EXAMIANS APP
Building Construction A pre-stressed concrete pile is Lighter in weight All of these Easy to handle Extremely durable Lighter in weight All of these Easy to handle Extremely durable ANSWER DOWNLOAD EXAMIANS APP