Building Construction The concrete slump recommended for columns, is 50 to 100 mm 25 to 75 mm 75 to 125 mm 25 to 50 mm 50 to 100 mm 25 to 75 mm 75 to 125 mm 25 to 50 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower edge of the pitched roof, from where the rain water of the roof surface drops down, is known as Eaves Hip Ridge Gable Eaves Hip Ridge Gable ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Marble floor Terrazzo floor Mosaic floor Chips floor Marble floor Terrazzo floor Mosaic floor Chips floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: Sedimentary rock Metamorphic rock Igneous rock None of these Sedimentary rock Metamorphic rock Igneous rock None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 4 days 7 days 14 days 1 day 4 days 7 days 14 days 1 day ANSWER DOWNLOAD EXAMIANS APP