Building Construction The concrete slump recommended for columns, is 50 to 100 mm 75 to 125 mm 25 to 50 mm 25 to 75 mm 50 to 100 mm 75 to 125 mm 25 to 50 mm 25 to 75 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Curing of concrete Finishing of concrete Compaction of concrete Placing of concrete Curing of concrete Finishing of concrete Compaction of concrete Placing of concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept 15 cm 10 cm Less than its projection beyond wall base Equal to its projection beyond wall base 15 cm 10 cm Less than its projection beyond wall base Equal to its projection beyond wall base ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical sides of a door and window openings provided in a wall, are known as Verticals None of these Jambs Reveals Verticals None of these Jambs Reveals ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 40 to 65 mm 25 mm 65 to 100 mm 25 to 40 mm 40 to 65 mm 25 mm 65 to 100 mm 25 to 40 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Chips floor Marble floor Mosaic floor Terrazzo floor Chips floor Marble floor Mosaic floor Terrazzo floor ANSWER DOWNLOAD EXAMIANS APP