Building Construction The differential settlement in case of foundations on sandy soils should not exceed 100 mm 25 mm 65 mm 40 mm 100 mm 25 mm 65 mm 40 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Queen closer may be placed In header course In stretcher course In stretcher course next to first brick In header course next to first brick In header course In stretcher course In stretcher course next to first brick In header course next to first brick ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower half portion between crown and skew back of the arch, is called Soffit Springing Spandril Haunch Soffit Springing Spandril Haunch ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Mosaic floor Chips floor Marble floor Terrazzo floor Mosaic floor Chips floor Marble floor Terrazzo floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction Arches in the form of masonry arcs struck from more than four centres, are called Ogee arches Drop gothic arches Gothic arches Two curved arches Ogee arches Drop gothic arches Gothic arches Two curved arches ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the commonly adopted geophysical method in civil engineering from the following: Gravitational method The seismic method Both (A) and (B) of the above Electrical resistivity method Gravitational method The seismic method Both (A) and (B) of the above Electrical resistivity method ANSWER DOWNLOAD EXAMIANS APP