The differential settlement in case of foundations on sandy soils should not exceed

100 mm
40 mm
65 mm
25 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The process of keeping concrete moist for a certain period after its finishing, is known as

Placing of concrete
Finishing of concrete
Curing of concrete
Compaction of concrete

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The angle between skew back of a flat arch and the horizontal, is kept approximately equal to

60°
0°
30°
90°

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
A covering of concrete placed on the exposed top of an external wall, is known as

Lintel
Coping
Cornice
Frieze

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form work from the underside of slabs, can be removed only after

7 days
4 days
1 day
14 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The range of spread from the wall base to outer edge of a brick work foundation does not exceed

2/3 horizontal to 1 vertical
1/2 horizontal to 1 vertical
1 horizontal to 1 vertical
2 horizontals to 1 vertical

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑