Building Construction

Building Construction
The differential settlement in case of foundations on sandy soils should not exceed

25 mm
40 mm
65 mm
100 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as

Combined footing
Raft footing
None of these
Strap footing

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form Work including the props can be removed from beams, only after

14 days
7 days
21 days
3 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
According to National Building Code, the hydrants in water mains is provided at minimum interval of

60 m
90 m
75 m
50 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In which of the following pairs both trees yield soft wood?

Deodar and Shishum
Chir and sal
Sal and teak
Chir and deodar

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known

Construction piles
Eccentric piles
Raking piles
Sinking piles

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑