Building Construction The differential settlement in case of foundations on sandy soils should not exceed 40 mm 65 mm 25 mm 100 mm 40 mm 65 mm 25 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/10th of the span 1/6th of the span 1/8th of the span 1/12th of the span 1/10th of the span 1/6th of the span 1/8th of the span 1/12th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction To obtain good bonding in brick masonry Vertical joints in alternate courses are kept in plumb line First class bricks are used All of these Bats are used where necessary Vertical joints in alternate courses are kept in plumb line First class bricks are used All of these Bats are used where necessary ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil, may be improved by Compaction Grouting Drainage Chemical action Compaction Grouting Drainage Chemical action ANSWER DOWNLOAD EXAMIANS APP
Building Construction To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act At the centre of the base Neither (A), (B) nor (C) Within the middle fifth of the base Within the middle third of the base At the centre of the base Neither (A), (B) nor (C) Within the middle fifth of the base Within the middle third of the base ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the construction of arches, sand box method is used for Centring None of these Striking of centring Actual laying of arch work Centring None of these Striking of centring Actual laying of arch work ANSWER DOWNLOAD EXAMIANS APP