Building Construction The differential settlement in case of foundations on sandy soils should not exceed 65 mm 40 mm 100 mm 25 mm 65 mm 40 mm 100 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A solid core of rock is formed inside the cylinder in the case of Percussion drilling Auger boring Diamond drilling Wash boring Percussion drilling Auger boring Diamond drilling Wash boring ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible deflection of a timber beam supporting a roof, is L/150 L/260 L/360 L/100 L/150 L/260 L/360 L/100 ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 1, 2, 3, 4, 5 3, 2, 5, 1, 4 2, 1, 3, 5, 4 5, 4, 3, 2, 1 1, 2, 3, 4, 5 3, 2, 5, 1, 4 2, 1, 3, 5, 4 5, 4, 3, 2, 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is Ridge None of these Valley Hip Ridge None of these Valley Hip ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 1 day 7 days 14 days 4 days 1 day 7 days 14 days 4 days ANSWER DOWNLOAD EXAMIANS APP