The differential settlement in case of foundations on sandy soils should not exceed

100 mm
25 mm
65 mm
40 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Queen closer may be placed

In header course
In stretcher course
In stretcher course next to first brick
In header course next to first brick

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The lower half portion between crown and skew back of the arch, is called

Soffit
Springing
Spandril
Haunch

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
A floor constructed with 3 mm marble chips, is known

Mosaic floor
Chips floor
Marble floor
Terrazzo floor

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Arches in the form of masonry arcs struck from more than four centres, are called

Ogee arches
Drop gothic arches
Gothic arches
Two curved arches

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Pick up the commonly adopted geophysical method in civil engineering from the following:

Gravitational method
The seismic method
Both (A) and (B) of the above
Electrical resistivity method

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑