Building Construction The differential settlement in case of foundations on sandy soils should not exceed 25 mm 65 mm 40 mm 100 mm 25 mm 65 mm 40 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple close roof is suitable for maximum span of 5.5 m 2.5 m 3.5 m 4.5 m 5.5 m 2.5 m 3.5 m 4.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction Engineering news formula for obtaining safe bearing capacity of pile for drop hammer, is, Q = Wh/6 (S + 2.5) Q = (W × 2.5)/6 (S + h) Q = (W × 6)/h (S + 2.5) Q = Wh/2.5 (S + 6) Q = Wh/6 (S + 2.5) Q = (W × 2.5)/6 (S + h) Q = (W × 6)/h (S + 2.5) Q = Wh/2.5 (S + 6) ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical member running through middle of a shutter frame, is Mullion Post Reveal Style Mullion Post Reveal Style ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 1 day 14 days 4 days 7 days 1 day 14 days 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction In which of the following pairs both trees yield soft wood? Deodar and Shishum Sal and teak Chir and deodar Chir and sal Deodar and Shishum Sal and teak Chir and deodar Chir and sal ANSWER DOWNLOAD EXAMIANS APP