Building Construction The differential settlement in case of foundations on sandy soils should not exceed 40 mm 25 mm 65 mm 100 mm 40 mm 25 mm 65 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A solid core of rock is formed inside the cylinder in the case of Diamond drilling Auger boring Percussion drilling Wash boring Diamond drilling Auger boring Percussion drilling Wash boring ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling Is not suitable for deposits containing very coarse gravel Hinders the ground water observations and permeability test All listed here Is not economical for holes of less than 10 cm Is not suitable for deposits containing very coarse gravel Hinders the ground water observations and permeability test All listed here Is not economical for holes of less than 10 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Engineering news formula for obtaining safe bearing capacity of pile for drop hammer, is, Q = Wh/2.5 (S + 6) Q = (W × 6)/h (S + 2.5) Q = (W × 2.5)/6 (S + h) Q = Wh/6 (S + 2.5) Q = Wh/2.5 (S + 6) Q = (W × 6)/h (S + 2.5) Q = (W × 2.5)/6 (S + h) Q = Wh/6 (S + 2.5) ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 90° 60° 0° 30° 90° 60° 0° 30° ANSWER DOWNLOAD EXAMIANS APP
Building Construction The alignment of a cross joint along the plumb line is Bed block Perpend Lintel Vertical line Bed block Perpend Lintel Vertical line ANSWER DOWNLOAD EXAMIANS APP