Building Construction Which one of the following piles has a cast iron shoe even after removal of the hollow cylindrical steel casing? Pedestal pile Both (A) and (C) of the above Vibro pile Simplex pile Pedestal pile Both (A) and (C) of the above Vibro pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Raft foundation are generally preferred to when the area required for individual footing, is more than 30% of total area 50% of total area 40% to total area 25% to total area 30% of total area 50% of total area 40% to total area 25% to total area ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 40 mm 65 mm 25 mm 100 mm 40 mm 65 mm 25 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The X-ray rooms are plastered with Barium plaster Martin's cement Keen's cement Plaster of Paris Barium plaster Martin's cement Keen's cement Plaster of Paris ANSWER DOWNLOAD EXAMIANS APP
Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then None of these d = 0.557 a d = 0.775 a d = 0.445 a None of these d = 0.557 a d = 0.775 a d = 0.445 a ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 14 days 7 days 21 days 3 days 14 days 7 days 21 days 3 days ANSWER DOWNLOAD EXAMIANS APP