Building Construction Queen closer may be placed In stretcher course In header course In stretcher course next to first brick In header course next to first brick In stretcher course In header course In stretcher course next to first brick In header course next to first brick ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 25 to 30 cm 5 to 10 cm 15 to 20 cm 30 to 45 cm 25 to 30 cm 5 to 10 cm 15 to 20 cm 30 to 45 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundation in which a cantilever beam is provided to join two footings, is known as Raft footing Strap footing Strip footing Combined footing Raft footing Strap footing Strip footing Combined footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 to 50 1 in 20 1 in 5 1 in 10 1 to 50 1 in 20 1 in 5 1 in 10 ANSWER DOWNLOAD EXAMIANS APP
Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 20 % 10 % 15 % 25 % 20 % 10 % 15 % 25 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/8th of the span 1/10th of the span 1/12th of the span 1/6th of the span 1/8th of the span 1/10th of the span 1/12th of the span 1/6th of the span ANSWER DOWNLOAD EXAMIANS APP