Railway Engineering Yellow lighthand signal indicates proceed stop proceed cautiously None of these proceed stop proceed cautiously None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the center of arm of a semaphore signal above the ground is 7.5 m 8.5m 6.5 m 5.5m 7.5 m 8.5m 6.5 m 5.5m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The standard length of rail for Broad Gauge and Meter Gauge are respectively 13 m and 12 m 12 m and 12 m 13 m and 13 m 12 m and 13 m 13 m and 12 m 12 m and 12 m 13 m and 13 m 12 m and 13 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Anti creep bearing plates are provided on joints both (A) and (B) bridges and approaches None of these joints both (A) and (B) bridges and approaches None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering To ensure exact gauge, the gauge tie plates are provided at toe of the switch nose of crossing None of these both (A) and (B) toe of the switch nose of crossing None of these both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The distance through which the tongue rail moves laterally at the toe of the switch for movement of trains is called throw of the switch flangeway clearance None of these heel divergence throw of the switch flangeway clearance None of these heel divergence ANSWER DOWNLOAD EXAMIANS APP