Railway Engineering Yellow lighthand signal indicates proceed None of these stop proceed cautiously proceed None of these stop proceed cautiously ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 3,1,2,4 1,3,2,4 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Tensile strength of steel used in rails should not be less than 850 MPa 700 MPa 500 MPa 450 MPa 850 MPa 700 MPa 500 MPa 450 MPa ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally maximum cant permissible in Meter Gauge is 90 mm 75 mm 165 mm 140 mm 90 mm 75 mm 165 mm 140 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The object of providing a point lock is None of these to ensure that each switch is correctly set to detect any obstruction between and tongue rail to ensure that the point may not be operated while the train is on it None of these to ensure that each switch is correctly set to detect any obstruction between and tongue rail to ensure that the point may not be operated while the train is on it ANSWER DOWNLOAD EXAMIANS APP