Railway Engineering Yellow lighthand signal indicates stop None of these proceed cautiously proceed stop None of these proceed cautiously proceed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided On curves On straight track None of these When two different rail sections are required to be joined On curves On straight track None of these When two different rail sections are required to be joined ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The treadle bar is provided in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of both the rails near and parallel to inner side of one of the rails at right angle to the rail in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of both the rails near and parallel to inner side of one of the rails at right angle to the rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Tensile strength of steel used in rails should not be less than 500 MPa 700 MPa 850 MPa 450 MPa 500 MPa 700 MPa 850 MPa 450 MPa ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 10.21m 6.10 m 8.84 m 10.82 m 10.21m 6.10 m 8.84 m 10.82 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of cotters used in CST-9 sleepers is 3 4 2 5 3 4 2 5 ANSWER DOWNLOAD EXAMIANS APP