Railway Engineering

Railway Engineering
Yellow lighthand signal indicates

proceed
None of these
stop
proceed cautiously

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is

3,1,4,2
3,1,2,4
1,3,2,4
1,3,4,2

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements

1 and 4 are correct
I and 2 are correct
2 and 3 are correct
3 and 4 are correct

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
Tensile strength of steel used in rails should not be less than

850 MPa
700 MPa
500 MPa
450 MPa

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
Normally maximum cant permissible in Meter Gauge is

90 mm
75 mm
165 mm
140 mm

ANSWER DOWNLOAD EXAMIANS APP

Railway Engineering
The object of providing a point lock is

None of these
to ensure that each switch is correctly set
to detect any obstruction between and tongue rail
to ensure that the point may not be operated while the train is on it

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Railway Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑