Railway Engineering Yellow lighthand signal indicates proceed proceed cautiously None of these stop proceed proceed cautiously None of these stop ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be maximum at the middle of A and B Cannot be determined from the given data Will be more in the direction of A to B Will be more in the direction of B to A Will be maximum at the middle of A and B Cannot be determined from the given data Will be more in the direction of A to B Will be more in the direction of B to A ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Dog spikes are used for fixing rail to the concrete sleepers CST-9 sleepers wooden sleepers steel trough sleepers concrete sleepers CST-9 sleepers wooden sleepers steel trough sleepers ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal None of these both arms are horizontal both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal None of these both arms are horizontal ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For the purpose of track maintenance, the number of turn out equivalent to one track km are 1 10 2 5 1 10 2 5 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP