Railway Engineering Yellow lighthand signal indicates proceed None of these proceed cautiously stop proceed None of these proceed cautiously stop ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? triangle traverser turntable scotch block triangle traverser turntable scotch block ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 0.168 cm 7.432 cm -0.168 cm 7.768 cm 0.168 cm 7.432 cm -0.168 cm 7.768 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided On curves On straight track When two different rail sections are required to be joined None of these On curves On straight track When two different rail sections are required to be joined None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering At points and crossings, the total number of sleepers for 1 in 12 turnouts in Broad Gauge is 71 70 72 73 71 70 72 73 ANSWER DOWNLOAD EXAMIANS APP