Railway Engineering The nominal size of ballast used for points and crossings is 40 mm 25 mm 50 mm 10 mm 40 mm 25 mm 50 mm 10 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements I and 2 are correct 1 and 4 are correct 2 and 3 are correct 3 and 4 are correct I and 2 are correct 1 and 4 are correct 2 and 3 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates proceed None of these stop proceed cautiously proceed None of these stop proceed cautiously ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following factors govern the choice of the gauge ?i) volume and nature of trafficii) speed of trainiii) physical features of the countryThe correct answer is both (ii) and (iii) (i), (ii) and (iii) both (i) and (ii) only (i) both (ii) and (iii) (i), (ii) and (iii) both (i) and (ii) only (i) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The total gap on both sides between the inside edges of wheel flanges and gauge faces of the rail is kept as 19 mm 16 mm 13 mm 10 mm 19 mm 16 mm 13 mm 10 mm ANSWER DOWNLOAD EXAMIANS APP