Railway Engineering The nominal size of ballast used for points and crossings is 40 mm 10 mm 50 mm 25 mm 40 mm 10 mm 50 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following mechanical devices is used to ensure that route cannot be changed while the train is on the point even after putting back the signal ? stretcher bar detectors point lock iock bar stretcher bar detectors point lock iock bar ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Largest percentage of material in the rail is in its head foot web head and foot both head foot web head and foot both ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 12 8 16 4 12 8 16 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a single line meter gauge track in embankment as adopted on Indian Railways is 4.88 mm 4.27 mm 5.49 mm 4.55 mm 4.88 mm 4.27 mm 5.49 mm 4.55 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP