Railway Engineering The nominal size of ballast used for points and crossings is 10 mm 50 mm 25 mm 40 mm 10 mm 50 mm 25 mm 40 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided None of these When two different rail sections are required to be joined On straight track On curves None of these When two different rail sections are required to be joined On straight track On curves ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 52 kg rails are mostly used in Meter Gauge Broad Gauge Narrow Gauge both (a) and (b) Meter Gauge Broad Gauge Narrow Gauge both (a) and (b) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When the rail ends rest on a joint sleeper, the joint is termed as suspended rail joint bridge joint base joint supported rail joint suspended rail joint bridge joint base joint supported rail joint ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The purpose of providing fillet in a rail section is to Reduce the wear Increase the lateral strength Increase the vertical stiffness Avoid the stress concentration Reduce the wear Increase the lateral strength Increase the vertical stiffness Avoid the stress concentration ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The correct relation between curve lead (CL), switch lead (SL) and lead of cros¬sing (L) is given by CL = L – SL L =CL-SL L = (CL+SL)/2 SL = L + CL CL = L – SL L =CL-SL L = (CL+SL)/2 SL = L + CL ANSWER DOWNLOAD EXAMIANS APP