Railway Engineering To ensure exact gauge, the gauge tie plates are provided at nose of crossing toe of the switch both (A) and (B) None of these nose of crossing toe of the switch both (A) and (B) None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A Broad Gauge branch line takes off as a contrary flexure from a main line If the superelevation required for branch line is 10 mm and cant deficiency is 75 mm, the superelevation to be actually provided on the branch line will be 10 mm 15 mm 65 mm 85 mm 10 mm 15 mm 65 mm 85 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For the purpose of track maintenance, the number of turn out equivalent to one track km are 1 2 10 5 1 2 10 5 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Vertical curves are provided where algebraic difference between grades is equal to or less than 2 mm/m less than 4 mm/m more than 4mm/m more than 2 mm/m less than 2 mm/m less than 4 mm/m more than 4mm/m more than 2 mm/m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is 1 None of these 2 3 1 None of these 2 3 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Creep is the Difference in level of two rails Vertical movement of rail Longitudinal movement of rail Lateral movement of rail Difference in level of two rails Vertical movement of rail Longitudinal movement of rail Lateral movement of rail ANSWER DOWNLOAD EXAMIANS APP