Railway Engineering To ensure exact gauge, the gauge tie plates are provided at nose of crossing toe of the switch both (A) and (B) None of these nose of crossing toe of the switch both (A) and (B) None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When the rail ends rest on a joint sleeper, the joint is termed as base joint suspended rail joint supported rail joint bridge joint base joint suspended rail joint supported rail joint bridge joint ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Gauge is the distance between None of these outer faces of rails running faces of rails center to center of rails None of these outer faces of rails running faces of rails center to center of rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Composite sleeper index is the index of Hardness and strength Wear resistance and hardness Toughness and wear resistance Strength and toughness Hardness and strength Wear resistance and hardness Toughness and wear resistance Strength and toughness ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Maximum value of ‘throw of switch’ for Broad Gauge track is 115 mm 89 mm 100 mm 95 mm 115 mm 89 mm 100 mm 95 mm ANSWER DOWNLOAD EXAMIANS APP