Railway Engineering Which of the following methods of designation of crossing is mostly used in India ? right angle method None of these isosceles angle method center line method right angle method None of these isosceles angle method center line method ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Minimum composite sleeper index pres-cried on Indian Railways for a track sleeper is 1353 552 1588 783 1353 552 1588 783 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 0.168 cm -0.168 cm 7.768 cm 7.432 cm 0.168 cm -0.168 cm 7.768 cm 7.432 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (ii) and (iii) (iii) and (iv) (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) (i)and(iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The sleepers resting directly on girder are fastened to the top flange of girder by dog spikes hook bolts rail screws fang bolts dog spikes hook bolts rail screws fang bolts ANSWER DOWNLOAD EXAMIANS APP