Railway Engineering A triangle is used for Preventing the vehicles from running off the track Changing the direction of engine Separating all the sidings and shunting lines from main lines Transferring wagons to and from parallel tracks without shunting Preventing the vehicles from running off the track Changing the direction of engine Separating all the sidings and shunting lines from main lines Transferring wagons to and from parallel tracks without shunting ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are only (i) (i) and (iii) (i)and(ii) (ii) and (iii) only (i) (i) and (iii) (i)and(ii) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? triangle traverser scotch block turntable triangle traverser scotch block turntable ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Vertical curves are provided where algebraic difference between grades is equal to or more than 4mm/m less than 4 mm/m more than 2 mm/m less than 2 mm/m more than 4mm/m less than 4 mm/m more than 2 mm/m less than 2 mm/m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP