Railway Engineering For the purpose of track maintenance, the number of turn out equivalent to one track km are 5 2 10 1 5 2 10 1 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The object of providing a point lock is None of these to ensure that the point may not be operated while the train is on it to ensure that each switch is correctly set to detect any obstruction between and tongue rail None of these to ensure that the point may not be operated while the train is on it to ensure that each switch is correctly set to detect any obstruction between and tongue rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.432 cm 0.168 cm -0.168 cm 7.768 cm 7.432 cm 0.168 cm -0.168 cm 7.768 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The load on each axle of a locomotive is 22 tonnes. If the coefficient of friction is 0.2, then the hauling capacity due to 3 pairs of driving wheels will be 13.21 19.81 6.61 26.41 13.21 19.81 6.61 26.41 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Width of ballast section for Broad Gauge is 3.35 m 1.83 m 4.30 m 2.25 m 3.35 m 1.83 m 4.30 m 2.25 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The correct relation between curve lead (CL), switch lead (SL) and lead of cros¬sing (L) is given by L = (CL+SL)/2 CL = L – SL L =CL-SL SL = L + CL L = (CL+SL)/2 CL = L – SL L =CL-SL SL = L + CL ANSWER DOWNLOAD EXAMIANS APP