Railway Engineering For the purpose of track maintenance, the number of turn out equivalent to one track km are 2 10 5 1 2 10 5 1 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Maximum value of ‘throw of switch’ for Broad Gauge track is 95 mm 100 mm 89 mm 115 mm 95 mm 100 mm 89 mm 115 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates proceed cautiously stop None of these proceed proceed cautiously stop None of these proceed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The type of bearing plate used in all joints and on curves to give better bearing area to the rails is cast iron anti creep bearing plate flat mild steel bearing plate None of these mild steel canted bearing plate cast iron anti creep bearing plate flat mild steel bearing plate None of these mild steel canted bearing plate ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 55 mm/sec 20 mm/sec 35 mm/sec 65 mm/sec 55 mm/sec 20 mm/sec 35 mm/sec 65 mm/sec ANSWER DOWNLOAD EXAMIANS APP