Railway Engineering For the purpose of track maintenance, the number of turn out equivalent to one track km are 10 5 2 1 10 5 2 1 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally the limiting value of cant is (where G is the gauge.) G/15 G/12 G/10 G/8 G/15 G/12 G/10 G/8 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 20 mm/sec 35 mm/sec 55 mm/sec 65 mm/sec 20 mm/sec 35 mm/sec 55 mm/sec 65 mm/sec ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For developing thinly populated areas, the correct choice of gauge is Narrow Gaugev Meter Gauge Any of these Broad Gauge Narrow Gaugev Meter Gauge Any of these Broad Gauge ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Study the following statements regarding creep. i) Creep is greater on curves than on tangent railway track, ii) Creep in new rails is more than that in old rails, iii) Creep is more on steep gradients than on level track. The correct answer is (i), (ii) and (iii) (ii) and (iii) (i)and(ii) only (i) (i), (ii) and (iii) (ii) and (iii) (i)and(ii) only (i) ANSWER DOWNLOAD EXAMIANS APP