Railway Engineering Maximum value of ‘throw of switch’ for Broad Gauge track is 100 mm 89 mm 115 mm 95 mm 100 mm 89 mm 115 mm 95 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number offish bolts per fish plate is 6 4 5 2 6 4 5 2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The slipping of driving wheels of locomotives on the rail surface causes hogging of rails wheel burns corrugation of rails scabbing of rails hogging of rails wheel burns corrugation of rails scabbing of rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 6.10 m 10.21m 8.84 m 10.82 m 6.10 m 10.21m 8.84 m 10.82 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A Broad Gauge branch line takes off as a contrary flexure from a main line If the superelevation required for branch line is 10 mm and cant deficiency is 75 mm, the superelevation to be actually provided on the branch line will be 65 mm 85 mm 10 mm 15 mm 65 mm 85 mm 10 mm 15 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The purpose of providing fillet in a rail section is to Reduce the wear Increase the lateral strength Increase the vertical stiffness Avoid the stress concentration Reduce the wear Increase the lateral strength Increase the vertical stiffness Avoid the stress concentration ANSWER DOWNLOAD EXAMIANS APP