Railway Engineering The height of the rail for 52 kg rail section is 156 mm 187 mm 162 mm 189 mm 156 mm 187 mm 162 mm 189 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The object of providing a point lock is to detect any obstruction between and tongue rail None of these to ensure that the point may not be operated while the train is on it to ensure that each switch is correctly set to detect any obstruction between and tongue rail None of these to ensure that the point may not be operated while the train is on it to ensure that each switch is correctly set ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The width of foot for 90 R rail section is 146.0 mm 136.5 mm 122.2 mm 100 mm 146.0 mm 136.5 mm 122.2 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A treadle bar is used for setting points and crossings interlocking points and signal track maintenance setting marshalling yard signals setting points and crossings interlocking points and signal track maintenance setting marshalling yard signals ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering To ensure exact gauge, the gauge tie plates are provided at None of these toe of the switch nose of crossing both (A) and (B) None of these toe of the switch nose of crossing both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Stretcher bar is provided To ensure exact gauge at the toe of the switch as well as the nose of crossing To maintain the two tongue rails at the exact distance To prevent any vertical movement between the wing rail and nose of crossing To permit lateral movement of the tongue rail To ensure exact gauge at the toe of the switch as well as the nose of crossing To maintain the two tongue rails at the exact distance To prevent any vertical movement between the wing rail and nose of crossing To permit lateral movement of the tongue rail ANSWER DOWNLOAD EXAMIANS APP