Railway Engineering The height of the center of arm of a semaphore signal above the ground is 8.5m 6.5 m 5.5m 7.5 m 8.5m 6.5 m 5.5m 7.5 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Creep is the Lateral movement of rail Longitudinal movement of rail Vertical movement of rail Difference in level of two rails Lateral movement of rail Longitudinal movement of rail Vertical movement of rail Difference in level of two rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following factors govern the choice of the gauge ? i) volume and nature of traffic ii) speed of train iii) physical features of the country The correct answer is (i), (ii) and (iii) only (i) both (ii) and (iii) both (i) and (ii) (i), (ii) and (iii) only (i) both (ii) and (iii) both (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on thei) type of gaugeii) number of tracks to be laid side by sideiii) slope of sides of embankment or cuttingThe correct answer is only (i) both (i) and (ii) both (i) and (iii) (i), (ii) and (iii) only (i) both (i) and (ii) both (i) and (iii) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is None of these 1 2 3 None of these 1 2 3 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of keys used in CST-9 sleeper is 3 None of these 2 4 3 None of these 2 4 ANSWER DOWNLOAD EXAMIANS APP