Railway Engineering The height of the center of arm of a semaphore signal above the ground is 6.5 m 7.5 m 5.5m 8.5m 6.5 m 7.5 m 5.5m 8.5m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 60 R rails are mostly used in Broad Gauge Narrow Gauge None of these Metre Gauge Broad Gauge Narrow Gauge None of these Metre Gauge ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (ii) and (iii) (i)and(iv) (iii) and (iv) (i) and (ii) (ii) and (iii) (i)and(iv) (iii) and (iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Cant deficiency occurs when a vehicle travels around a curve at Speeds higher than equilibrium speed Booked speed Equilibrium speed Speeds lower than equilibrium speed Speeds higher than equilibrium speed Booked speed Equilibrium speed Speeds lower than equilibrium speed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering If ‘A’ is the angle formed by two gauge faces, the crossing number will be sec A tan A cot A Arad sec A tan A cot A Arad ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP