Railway Engineering Stretcher bar is provided To ensure exact gauge at the toe of the switch as well as the nose of crossing To prevent any vertical movement between the wing rail and nose of crossing To permit lateral movement of the tongue rail To maintain the two tongue rails at the exact distance To ensure exact gauge at the toe of the switch as well as the nose of crossing To prevent any vertical movement between the wing rail and nose of crossing To permit lateral movement of the tongue rail To maintain the two tongue rails at the exact distance ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A triangle is used for Transferring wagons to and from parallel tracks without shunting Preventing the vehicles from running off the track Changing the direction of engine Separating all the sidings and shunting lines from main lines Transferring wagons to and from parallel tracks without shunting Preventing the vehicles from running off the track Changing the direction of engine Separating all the sidings and shunting lines from main lines ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Largest percentage of material in the rail is in its web head head and foot both foot web head head and foot both foot ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering What will be the curve lead for a 1 in 8.5 turnout taking off from a straight broad gauge track? 7.45 m 14.24 m 21.04 m 28.49 m 7.45 m 14.24 m 21.04 m 28.49 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of keys used in CST-9 sleeper is 2 None of these 3 4 2 None of these 3 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements I and 2 are correct 1 and 4 are correct 3 and 4 are correct 2 and 3 are correct I and 2 are correct 1 and 4 are correct 3 and 4 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP