Railway Engineering Stretcher bar is provided To maintain the two tongue rails at the exact distance To prevent any vertical movement between the wing rail and nose of crossing To permit lateral movement of the tongue rail To ensure exact gauge at the toe of the switch as well as the nose of crossing To maintain the two tongue rails at the exact distance To prevent any vertical movement between the wing rail and nose of crossing To permit lateral movement of the tongue rail To ensure exact gauge at the toe of the switch as well as the nose of crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following mechanical devices is used to ensure that route cannot be changed while the train is on the point even after putting back the signal ? detectors stretcher bar iock bar point lock detectors stretcher bar iock bar point lock ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Gauge is the distance between running faces of rails outer faces of rails center to center of rails None of these running faces of rails outer faces of rails center to center of rails None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Maximum value of ‘throw of switch’ for Broad Gauge track is 100 mm 95 mm 115 mm 89 mm 100 mm 95 mm 115 mm 89 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? scotch block triangle traverser turntable scotch block triangle traverser turntable ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The compensation for curvature on gradient for Meter Gauge is given by (where R is radius of curve.) 35/R 52.5/R 105/R 70/R 35/R 52.5/R 105/R 70/R ANSWER DOWNLOAD EXAMIANS APP