Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 8.84 m 10.21m 10.82 m 6.10 m 8.84 m 10.21m 10.82 m 6.10 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Flat mild steel bearing plates are used On all the above On all joints and curves For points and crossings in the lead portion With wooden sleepers at locations where creep is likely to be developed On all the above On all joints and curves For points and crossings in the lead portion With wooden sleepers at locations where creep is likely to be developed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 8 12 16 4 8 12 16 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Pandrol clips cannot be used with concrete sleepers CST-9 sleepers steel trough sleepers wooden sleepers concrete sleepers CST-9 sleepers steel trough sleepers wooden sleepers ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The compensation for curvature on gradient for Meter Gauge is given by (where R is radius of curve.) 105/R 70/R 35/R 52.5/R 105/R 70/R 35/R 52.5/R ANSWER DOWNLOAD EXAMIANS APP