Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 8.84 m 6.10 m 10.82 m 10.21m 8.84 m 6.10 m 10.82 m 10.21m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The main function of a fish plate is To join the two rails together To allow rail to expand and contract freely To join rails with the sleeper None of these To join the two rails together To allow rail to expand and contract freely To join rails with the sleeper None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The purpose of providing fillet in a rail section is to Reduce the wear Avoid the stress concentration Increase the lateral strength Increase the vertical stiffness Reduce the wear Avoid the stress concentration Increase the lateral strength Increase the vertical stiffness ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is 2 None of these 3 1 2 None of these 3 1 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering To ensure exact gauge, the gauge tie plates are provided at nose of crossing toe of the switch both (A) and (B) None of these nose of crossing toe of the switch both (A) and (B) None of these ANSWER DOWNLOAD EXAMIANS APP