Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 10.82 m 8.84 m 10.21m 6.10 m 10.82 m 8.84 m 10.21m 6.10 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 35 mm/sec 55 mm/sec 20 mm/sec 65 mm/sec 35 mm/sec 55 mm/sec 20 mm/sec 65 mm/sec ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The main function of a fish plate is To join rails with the sleeper To join the two rails together To allow rail to expand and contract freely None of these To join rails with the sleeper To join the two rails together To allow rail to expand and contract freely None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided None of these When two different rail sections are required to be joined On straight track On curves None of these When two different rail sections are required to be joined On straight track On curves ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The sleepers resting directly on girder are fastened to the top flange of girder by fang bolts rail screws dog spikes hook bolts fang bolts rail screws dog spikes hook bolts ANSWER DOWNLOAD EXAMIANS APP