Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 1,3,4,2 1,3,2,4 3,1,2,4 3,1,4,2 1,3,4,2 1,3,2,4 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The compensation for curvature on gradient for Meter Gauge is given by (where R is radius of curve.) 70/R 105/R 35/R 52.5/R 70/R 105/R 35/R 52.5/R ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided When two different rail sections are required to be joined None of these On curves On straight track When two different rail sections are required to be joined None of these On curves On straight track ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Stretcher bar is provided To maintain the two tongue rails at the exact distance To prevent any vertical movement between the wing rail and nose of crossing To ensure exact gauge at the toe of the switch as well as the nose of crossing To permit lateral movement of the tongue rail To maintain the two tongue rails at the exact distance To prevent any vertical movement between the wing rail and nose of crossing To ensure exact gauge at the toe of the switch as well as the nose of crossing To permit lateral movement of the tongue rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Loose jaws of steel trough sleepers are made of cast iron cast steel mild steel spring steel cast iron cast steel mild steel spring steel ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct I and 2 are correct ANSWER DOWNLOAD EXAMIANS APP