Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Metal sleepers are superior to wooden sleepers with respect to life cost track circuiting fastening life cost track circuiting fastening ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The standard length of rail for Broad Gauge and Meter Gauge are respectively 13 m and 12 m 13 m and 13 m 12 m and 13 m 12 m and 12 m 13 m and 12 m 13 m and 13 m 12 m and 13 m 12 m and 12 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The slipping of driving wheels of locomotives on the rail surface causes corrugation of rails scabbing of rails wheel burns hogging of rails corrugation of rails scabbing of rails wheel burns hogging of rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Two important constituents in the composition of steel used for rail are Carbon and sulphur Carbon and manganese Carbon and silicon Manganese and phosphorous Carbon and sulphur Carbon and manganese Carbon and silicon Manganese and phosphorous ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be maximum at the middle of A and B Will be more in the direction of A to B Cannot be determined from the given data Will be more in the direction of B to A Will be maximum at the middle of A and B Will be more in the direction of A to B Cannot be determined from the given data Will be more in the direction of B to A ANSWER DOWNLOAD EXAMIANS APP