Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements about concrete sleepers.1. They improve the track modulus.2. They have good scrap value.3. They render transportation easy.4. They maintain the gauge quite satisfactorily of these statements 1 and 4 are correct 1 and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct 1 and 2 are correct 3 and 4 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements about concrete sleepers. 1. They improve the track modulus. 2. They have good scrap value. 3. They render transportation easy. 4. They maintain the gauge quite satisfactorily. Of these statements 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct 1 and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct 1 and 2 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Two important constituents in the composition of steel used for rail are Carbon and sulphur Carbon and silicon Manganese and phosphorous Carbon and manganese Carbon and sulphur Carbon and silicon Manganese and phosphorous Carbon and manganese ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Wear of rails is maximum in weight of tunnels tangent track coastal area sharp curve tunnels tangent track coastal area sharp curve ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number offish bolts per fish plate is 2 6 5 4 2 6 5 4 ANSWER DOWNLOAD EXAMIANS APP