Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 8 12 16 4 8 12 16 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Gauge is the distance between None of these outer faces of rails running faces of rails center to center of rails None of these outer faces of rails running faces of rails center to center of rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Standard size of wooden sleeper for Broad Gauge track is 275x25x13 cm 180x20x11.5 cm 225x23x13 cm 250x26x12 cm 275x25x13 cm 180x20x11.5 cm 225x23x13 cm 250x26x12 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of keys used in CST-9 sleeper is 3 2 4 None of these 3 2 4 None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 60 R rails are mostly used in Narrow Gauge Metre Gauge Broad Gauge None of these Narrow Gauge Metre Gauge Broad Gauge None of these ANSWER DOWNLOAD EXAMIANS APP