Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 1,3,2,4 3,1,2,4 3,1,4,2 1,3,4,2 1,3,2,4 3,1,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Study the following statements regarding creep.i) Creep is greater on curves than on tangent railway track,ii) Creep in new rails is more than that in old rails,iii) Creep is more on steep gradients than on level track.The correct answer is (i)and(ii) only (i) (i), (ii) and (iii) (ii) and (iii) (i)and(ii) only (i) (i), (ii) and (iii) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering To ensure exact gauge, the gauge tie plates are provided at nose of crossing None of these both (A) and (B) toe of the switch nose of crossing None of these both (A) and (B) toe of the switch ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A triangle is used for Transferring wagons to and from parallel tracks without shunting Separating all the sidings and shunting lines from main lines Preventing the vehicles from running off the track Changing the direction of engine Transferring wagons to and from parallel tracks without shunting Separating all the sidings and shunting lines from main lines Preventing the vehicles from running off the track Changing the direction of engine ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The steepest gradient permissible on a 2.5° curve for Broad Gauge line having ruling gradient of 1 in 200 is 1 in 250 1 in 275 1 in 235 1 in 222 1 in 250 1 in 275 1 in 235 1 in 222 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following mechanical devices is used to ensure that route cannot be changed while the train is on the point even after putting back the signal ? iock bar stretcher bar detectors point lock iock bar stretcher bar detectors point lock ANSWER DOWNLOAD EXAMIANS APP