Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a double line Broad Gauge track in cutting (excluding drains) as adopted on Indian Railways is 10.82 m 10.21m 6.10 m 8.84 m 10.82 m 10.21m 6.10 m 8.84 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements about concrete sleepers.1. They improve the track modulus.2. They have good scrap value.3. They render transportation easy.4. They maintain the gauge quite satisfactorily of these statements 3 and 4 are correct 1 and 4 are correct 1 and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct 1 and 2 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Two important constituents in the composition of steel used for rail are Manganese and phosphorous Carbon and silicon Carbon and sulphur Carbon and manganese Manganese and phosphorous Carbon and silicon Carbon and sulphur Carbon and manganese ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a scissors cross-over, the crossings provided arei) 2 obtuse angle crossingsii) 4 obtuse angle crossingsiii) 4 acute angle crossingsiv) 6 acute angle crossingsThe correct answer is (ii) and (iv) (i)and(iv) (i) and (iii) (ii) and (iii) (ii) and (iv) (i)and(iv) (i) and (iii) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP