Railway Engineering The sleepers resting directly on girder are fastened to the top flange of girder by hook bolts dog spikes rail screws fang bolts hook bolts dog spikes rail screws fang bolts ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering What will be the curve lead for a 1 in 8.5 turnout taking off from a straight broad gauge track? 21.04 m 7.45 m 28.49 m 14.24 m 21.04 m 7.45 m 28.49 m 14.24 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) -0.168 cm 7.768 cm 7.432 cm 0.168 cm -0.168 cm 7.768 cm 7.432 cm 0.168 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The side slope of embankments for a railway track is generally taken as 1.5:1 2:1 1:1 1:2 1.5:1 2:1 1:1 1:2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.432 cm 0.168 cm -0.168 cm 7.768 cm 7.432 cm 0.168 cm -0.168 cm 7.768 cm ANSWER DOWNLOAD EXAMIANS APP