Railway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? triangle traverser scotch block turntable triangle traverser scotch block turntable ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Maximum value of ‘throw of switch’ for Broad Gauge track is 95 mm 100 mm 89 mm 115 mm 95 mm 100 mm 89 mm 115 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 35 mm/sec 65 mm/sec 20 mm/sec 55 mm/sec 35 mm/sec 65 mm/sec 20 mm/sec 55 mm/sec ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The nominal size of ballast used for points and crossings is 40 mm 50 mm 10 mm 25 mm 40 mm 50 mm 10 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (ii) and (iii) (i) and (ii) (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) (i)and(iv) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP