Railway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? traverser turntable triangle scotch block traverser turntable triangle scotch block ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided On straight track None of these On curves When two different rail sections are required to be joined On straight track None of these On curves When two different rail sections are required to be joined ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The load on each axle of a locomotive is 22 tonnes. If the coefficient of friction is 0.2, then the hauling capacity due to 3 pairs of driving wheels will be 6.61 19.81 13.21 26.41 6.61 19.81 13.21 26.41 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 3 and 4 are correct 1 and 4 are correct 2 and 3 are correct I and 2 are correct 3 and 4 are correct 1 and 4 are correct 2 and 3 are correct I and 2 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A treadle bar is used for interlocking points and signal setting points and crossings setting marshalling yard signals track maintenance interlocking points and signal setting points and crossings setting marshalling yard signals track maintenance ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The standard length of rail for Broad Gauge and Meter Gauge are respectively 12 m and 13 m 13 m and 12 m 12 m and 12 m 13 m and 13 m 12 m and 13 m 13 m and 12 m 12 m and 12 m 13 m and 13 m ANSWER DOWNLOAD EXAMIANS APP