Railway Engineering Cant deficiency occurs when a vehicle travels around a curve at Speeds higher than equilibrium speed Speeds lower than equilibrium speed Equilibrium speed Booked speed Speeds higher than equilibrium speed Speeds lower than equilibrium speed Equilibrium speed Booked speed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are (i) and (iii) (i)and(ii) (ii) and (iii) only (i) (i) and (iii) (i)and(ii) (ii) and (iii) only (i) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.432 cm -0.168 cm 7.768 cm 0.168 cm 7.432 cm -0.168 cm 7.768 cm 0.168 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The limiting value of cant excess for Broad Gauge is 65 mm l00 mm 55 mm 75 mm 65 mm l00 mm 55 mm 75 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided When two different rail sections are required to be joined On curves On straight track None of these When two different rail sections are required to be joined On curves On straight track None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The object of providing a point lock is None of these to detect any obstruction between and tongue rail to ensure that each switch is correctly set to ensure that the point may not be operated while the train is on it None of these to detect any obstruction between and tongue rail to ensure that each switch is correctly set to ensure that the point may not be operated while the train is on it ANSWER DOWNLOAD EXAMIANS APP