Railway Engineering Fish plate is in contact with rail at foot of rail head of rail web of rail fishing plane foot of rail head of rail web of rail fishing plane ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are (i)and(ii) (i) and (iii) only (i) (ii) and (iii) (i)and(ii) (i) and (iii) only (i) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (ii) and (iii) (i)and(iv) (iii) and (iv) (i) and (ii) (ii) and (iii) (i)and(iv) (iii) and (iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A treadle bar is used for setting points and crossings setting marshalling yard signals track maintenance interlocking points and signal setting points and crossings setting marshalling yard signals track maintenance interlocking points and signal ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a B.G. railway track, the specified ruling gradent is 1 in 250. The horizontal curve of 3° on a gradient of 1 in 250 will have the permissible gradient of 1 in 357 1 in 512 1 in 457 1 in 257 1 in 357 1 in 512 1 in 457 1 in 257 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For developing thinly populated areas, the correct choice of gauge is Meter Gauge Broad Gauge Narrow Gaugev Any of these Meter Gauge Broad Gauge Narrow Gaugev Any of these ANSWER DOWNLOAD EXAMIANS APP