Railway Engineering Fish plate is in contact with rail at web of rail foot of rail head of rail fishing plane web of rail foot of rail head of rail fishing plane ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For the purpose of track maintenance, the number of turn out equivalent to one track km are 5 10 2 1 5 10 2 1 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1700/R 1850/R 1600/R 1750/R 1700/R 1850/R 1600/R 1750/R ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The object of providing a point lock is to ensure that the point may not be operated while the train is on it to detect any obstruction between and tongue rail to ensure that each switch is correctly set None of these to ensure that the point may not be operated while the train is on it to detect any obstruction between and tongue rail to ensure that each switch is correctly set None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering If a is the angle of crossing, then the number of crossings āNā according to right angle method is given by Vi cosec(a/2) cot(oc/2) Vi cot(cc/2) cot(a) Vi cosec(a/2) cot(oc/2) Vi cot(cc/2) cot(a) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Due to battering action of wheels over the end of the rails, the rails get bent down and are deflected at ends. These rails are called Buckled rails Hogged rails Roaring rails Corrugated rails Buckled rails Hogged rails Roaring rails Corrugated rails ANSWER DOWNLOAD EXAMIANS APP