Railway Engineering The formation width for a railway track depends on thei) type of gaugeii) number of tracks to be laid side by sideiii) slope of sides of embankment or cuttingThe correct answer is (i), (ii) and (iii) only (i) both (i) and (ii) both (i) and (iii) (i), (ii) and (iii) only (i) both (i) and (ii) both (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be more in the direction of B to A Cannot be determined from the given data Will be maximum at the middle of A and B Will be more in the direction of A to B Will be more in the direction of B to A Cannot be determined from the given data Will be maximum at the middle of A and B Will be more in the direction of A to B ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The total gap on both sides between the inside edges of wheel flanges and gauge faces of the rail is kept as 13 mm 19 mm 10 mm 16 mm 13 mm 19 mm 10 mm 16 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements about concrete sleepers. 1. They improve the track modulus. 2. They have good scrap value. 3. They render transportation easy. 4. They maintain the gauge quite satisfactorily. Of these statements 1 and 2 are correct 1 and 4 are correct 2 and 3 are correct 3 and 4 are correct 1 and 2 are correct 1 and 4 are correct 2 and 3 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The limiting value of cant gradient for all gauges is 1 in 720 1 in 360 1 in 1000 1 in 1200 1 in 720 1 in 360 1 in 1000 1 in 1200 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A triangle is used for Preventing the vehicles from running off the track Separating all the sidings and shunting lines from main lines Transferring wagons to and from parallel tracks without shunting Changing the direction of engine Preventing the vehicles from running off the track Separating all the sidings and shunting lines from main lines Transferring wagons to and from parallel tracks without shunting Changing the direction of engine ANSWER DOWNLOAD EXAMIANS APP