Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (ii) and (iii) (i) and (ii) (i)and(iv) (iii) and (iv) (ii) and (iii) (i) and (ii) (i)and(iv) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Ordinary rails are made of mild steel wrought iron cast iron high carbon steel mild steel wrought iron cast iron high carbon steel ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a sleeper density of (n+5), the number of sleepers required for constructing a broad gauge railway track of length 650 m is 985 975 900 963 985 975 900 963 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 16 4 8 12 16 4 8 12 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally maximum cant permissible in Meter Gauge is 75 mm 165 mm 90 mm 140 mm 75 mm 165 mm 90 mm 140 mm ANSWER DOWNLOAD EXAMIANS APP