Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i)and(iv) (iii) and (iv) (i) and (ii) (ii) and (iii) (i)and(iv) (iii) and (iv) (i) and (ii) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Lead of crossing is the distance from the toe of the switch to the actual nose of crossing heel of the switch to the theoretical nose of the crossing toe of the switch to the theoretical nose of crossing heel of the switch to the toe of the switch toe of the switch to the actual nose of crossing heel of the switch to the theoretical nose of the crossing toe of the switch to the theoretical nose of crossing heel of the switch to the toe of the switch ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the center of arm of a semaphore signal above the ground is 8.5m 7.5 m 6.5 m 5.5m 8.5m 7.5 m 6.5 m 5.5m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is 3 1 2 None of these 3 1 2 None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The compensation for curvature on gradient for Meter Gauge is given by (where R is radius of curve.) 35/R 70/R 52.5/R 105/R 35/R 70/R 52.5/R 105/R ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements about concrete sleepers.1. They improve the track modulus.2. They have good scrap value.3. They render transportation easy.4. They maintain the gauge quite satisfactorily of these statements 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct 1 and 2 are correct 2 and 3 are correct 1 and 4 are correct 3 and 4 are correct 1 and 2 are correct ANSWER DOWNLOAD EXAMIANS APP