Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (ii) and (iii) (iii) and (iv) (i) and (ii) (i)and(iv) (ii) and (iii) (iii) and (iv) (i) and (ii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Minimum composite sleeper index pres-cried on Indian Railways for a track sleeper is 1588 552 1353 783 1588 552 1353 783 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Flat mild steel bearing plates are used On all the above On all joints and curves With wooden sleepers at locations where creep is likely to be developed For points and crossings in the lead portion On all the above On all joints and curves With wooden sleepers at locations where creep is likely to be developed For points and crossings in the lead portion ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a B.G. railway track, the specified ruling gradent is 1 in 250. The horizontal curve of 3° on a gradient of 1 in 250 will have the permissible gradient of 1 in 512 1 in 257 1 in 457 1 in 357 1 in 512 1 in 257 1 in 457 1 in 357 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A Broad Gauge branch line takes off as a contrary flexure from a main line If the superelevation required for branch line is 10 mm and cant deficiency is 75 mm, the superelevation to be actually provided on the branch line will be 10 mm 65 mm 85 mm 15 mm 10 mm 65 mm 85 mm 15 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP