Railway Engineering 60 R rails are mostly used in Metre Gauge Narrow Gauge Broad Gauge None of these Metre Gauge Narrow Gauge Broad Gauge None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The total gap on both sides between the inside edges of wheel flanges and gauge faces of the rail is kept as 10 mm 16 mm 19 mm 13 mm 10 mm 16 mm 19 mm 13 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The treadle bar is provided at right angle to the rail near and parallel to inner side of one of the rails near and parallel to inner side of both the rails in the middle of the track a little in front of the toes of the tongue rail at right angle to the rail near and parallel to inner side of one of the rails near and parallel to inner side of both the rails in the middle of the track a little in front of the toes of the tongue rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Switch angle depends on i) heel divergence ii) length of tongue rail iii) flangeway clearance iv) throw of switch The correct answer is (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The sleepers resting directly on girder are fastened to the top flange of girder by fang bolts hook bolts rail screws dog spikes fang bolts hook bolts rail screws dog spikes ANSWER DOWNLOAD EXAMIANS APP