Railway Engineering Dog spikes are used for fixing rail to the concrete sleepers wooden sleepers CST-9 sleepers steel trough sleepers concrete sleepers wooden sleepers CST-9 sleepers steel trough sleepers ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the rail for 52 kg rail section is 162 mm 156 mm 189 mm 187 mm 162 mm 156 mm 189 mm 187 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The correct relation between curve lead (CL), switch lead (SL) and lead of cros¬sing (L) is given by CL = L – SL SL = L + CL L = (CL+SL)/2 L =CL-SL CL = L – SL SL = L + CL L = (CL+SL)/2 L =CL-SL ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be more in the direction of A to B Cannot be determined from the given data Will be maximum at the middle of A and B Will be more in the direction of B to A Will be more in the direction of A to B Cannot be determined from the given data Will be maximum at the middle of A and B Will be more in the direction of B to A ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided On straight track None of these When two different rail sections are required to be joined On curves On straight track None of these When two different rail sections are required to be joined On curves ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are (i)and(ii) (ii) and (iii) (i) and (iii) only (i) (i)and(ii) (ii) and (iii) (i) and (iii) only (i) ANSWER DOWNLOAD EXAMIANS APP