Railway Engineering Largest percentage of material in the rail is in its web head head and foot both foot web head head and foot both foot ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The correct relation between curve lead (CL), switch lead (SL) and lead of cros¬sing (L) is given by SL = L + CL L = (CL+SL)/2 L =CL-SL CL = L – SL SL = L + CL L = (CL+SL)/2 L =CL-SL CL = L – SL ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 8 16 12 4 8 16 12 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal None of these both arms are horizontal both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal None of these both arms are horizontal ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1750/R 1850/R 1600/R 1700/R 1750/R 1850/R 1600/R 1700/R ANSWER DOWNLOAD EXAMIANS APP