Railway Engineering The rail is designated by its weight weight per unit length cross-section length weight weight per unit length cross-section length ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? turntable triangle traverser scotch block turntable triangle traverser scotch block ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following methods of designation of crossing is mostly used in India ? right angle method isosceles angle method None of these center line method right angle method isosceles angle method None of these center line method ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates proceed stop proceed cautiously None of these proceed stop proceed cautiously None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The slipping of driving wheels of locomotives on the rail surface causes hogging of rails wheel burns scabbing of rails corrugation of rails hogging of rails wheel burns scabbing of rails corrugation of rails ANSWER DOWNLOAD EXAMIANS APP