Railway Engineering The rail is designated by its length weight cross-section weight per unit length length weight cross-section weight per unit length ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Metal sleepers are superior to wooden sleepers with respect to fastening life cost track circuiting fastening life cost track circuiting ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Due to battering action of wheels over the end of the rails, the rails get bent down and are deflected at ends. These rails are called Hogged rails Roaring rails Buckled rails Corrugated rails Hogged rails Roaring rails Buckled rails Corrugated rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Staggered joints are generally provided When two different rail sections are required to be joined On curves On straight track None of these When two different rail sections are required to be joined On curves On straight track None of these ANSWER DOWNLOAD EXAMIANS APP