Railway Engineering The rail is designated by its weight length cross-section weight per unit length weight length cross-section weight per unit length ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A triangle is used for Separating all the sidings and shunting lines from main lines Changing the direction of engine Preventing the vehicles from running off the track Transferring wagons to and from parallel tracks without shunting Separating all the sidings and shunting lines from main lines Changing the direction of engine Preventing the vehicles from running off the track Transferring wagons to and from parallel tracks without shunting ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The purpose of providing fillet in a rail section is to Reduce the wear Increase the lateral strength Avoid the stress concentration Increase the vertical stiffness Reduce the wear Increase the lateral strength Avoid the stress concentration Increase the vertical stiffness ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Width of ballast section for Broad Gauge is 4.30 m 2.25 m 3.35 m 1.83 m 4.30 m 2.25 m 3.35 m 1.83 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Switch angle is the angle between the gauge face of the stock rail and outer face of the tongue rail the outer face of the stock rail and the gauge face of the tongue rail the outer face of the stock rail and tongue rail the gauge face of the stock rail and tongue rail the gauge face of the stock rail and outer face of the tongue rail the outer face of the stock rail and the gauge face of the tongue rail the outer face of the stock rail and tongue rail the gauge face of the stock rail and tongue rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Dog spikes are used for fixing rail to the steel trough sleepers CST-9 sleepers wooden sleepers concrete sleepers steel trough sleepers CST-9 sleepers wooden sleepers concrete sleepers ANSWER DOWNLOAD EXAMIANS APP