Railway Engineering The rail is designated by its weight weight per unit length cross-section length weight weight per unit length cross-section length ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For the purpose of track maintenance, the number of turn out equivalent to one track km are 10 2 5 1 10 2 5 1 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Cant deficiency occurs when a vehicle travels around a curve at Booked speed Speeds lower than equilibrium speed Speeds higher than equilibrium speed Equilibrium speed Booked speed Speeds lower than equilibrium speed Speeds higher than equilibrium speed Equilibrium speed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The steepest gradient permissible on a 2.5° curve for Broad Gauge line having ruling gradient of 1 in 200 is 1 in 222 1 in 250 1 in 275 1 in 235 1 in 222 1 in 250 1 in 275 1 in 235 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a sleeper density of (n+5), the number of sleepers required for constructing a broad gauge railway track of length 650 m is 985 975 963 900 985 975 963 900 ANSWER DOWNLOAD EXAMIANS APP